Tender Value
₹8.1 L
EMD Value
₹8,090
Closing Date
24 Jul 2023, 3:30 pmClosed
Block Development Officer (V.P), Tiruchengode
Block Development Office ,Tiruchengode
Construction of Kitchen shed at T.Goundampalayam PUE School (Type 1) H/O T.Goundampalayam in Tiruchengode Block of Namakkal District under AGAMT - II - 2023 -24 TGD-11
2023_RDTN_338085_1
2918/2023/T3
Open Tender
Civil Works - Buildings
Item Rate
120 days
Tiruchengode
Required Documents as Per Schedule
4 documents required · 4 mandatory
₹0
₹8,090
Yes
22 Aug 2023
7 Jul 2023
24 Jul 2023
7 Jul 2023
24 Jul 2023
7 Jul 2023
Amount
Construction of Kitchen shed at T.Goundampalayam PUE School (Type - 1) H/O T.Goundampalayam in Tiruchengode Block of Namakkal District under AGAMT –II - 2023-24 TGD-11
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance all charges etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance all charges etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sree Muthu Constructions
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].