Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹89.7 L+₹3.8 L (4.47%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹90.1 L+₹4.3 L (4.97%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical rejected by BOO |
| Sl No | Description | Qty | Unit | STANLEE MAHONGNAO L1 | CARON ENTERPRISE L2 | SHANGREIHAN MUIVAH L3 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART -I (CONSTR OF RECEPTION ROOM) | ||||||
| 1.01 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil. | 198 | Sqm | 37,818 ₹37,818 | 34,452 ₹34,452 Lowest | 34,650 ₹34,650 |
| 1.02 | Earth work in excavation by mechanical / manual means in fdn trenches or drain n-exc 1.5 m in cluding dressing of side and bottoms, lift up to n. exc 1.5 m in depth and getting out excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m. in all kinds of soil. | 14.23 | Cum | 7,285.76 ₹7,285.76 | 6,645.41 ₹6,645.41 Lowest | 6,673.87 ₹6,673.87 |
| 1.03 | Providing and laying in position cement concrete 1:4:8 as in foundation filling and mass concrete of specified grade excluding the cost of centering and shuttering, All work up to plinth level. | 1.78 | Cum | 23,280.62 ₹23,280.62 | 18,337.56 ₹18,337.56 Lowest | 18,424.78 ₹18,424.78 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, 1:2:4 as in base of column & up to plinth height, excluding the cost of centering, shuttering, finishing and reinforcement, All work up to plinth level. | 7.45 | Cum | 1,10,721.9 ₹1,10,721.9 | 96,395.55 ₹96,395.55 Lowest | 96,857.45 ₹96,857.45 |
| 1.05 | Reinforced cement concrete work in 1:2:4 as in roof slab, lintel band/beam and Chajja . | 1.88 | Cum | 35,949.36 ₹35,949.36 | 32,817.28 ₹32,817.28 Lowest | 32,975.2 ₹32,975.2 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete | 62.44 | Sqm | 34,279.56 ₹34,279.56 | 31,282.44 ₹31,282.44 Lowest | 31,469.76 ₹31,469.76 |
| 1.07 | Centering and shuttering including strutting work to sides of Lintels, beams, plinth beams, girders, bressumers and cantilevers side and sofits rough finishing surface of concret. | 28.8 | Sqm | 31,248 ₹31,248 | 28,540.8 ₹28,540.8 Lowest | 28,656 ₹28,656 |
| 1.08 | Centering and shuttering including strutting work to Suspended floors, roofs, landings, balconies and access platform surface of concret. | 3.81 | Sqm | 5,208.27 ₹5,208.27 | 4,754.88 ₹4,754.88 Lowest | 4,777.74 ₹4,777.74 |
| 1.09 | Providing and laying in Steel reinforcement TMT bar for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 1,037.02 | Kg | 2,15,700.16 ₹2,15,700.16 | 1,51,404.92 ₹1,51,404.92 Lowest | 1,52,441.94 ₹1,52,441.94 |
Tender Value
₹82.6 L
EMD Value
₹1.7 L
Closing Date
6 Oct 2025, 11:30 amClosed
DIG, HQ 10 Sect AR
HQ 10 Sect AR c/o 99 APO PIN - 934830
Provn of reception cum rest room, storage, toilet and road for Helipad at Shangshak, 24 AR now 40 AR
2025_ARMHA_877671_1
IV.17018/Helipad/HQ 10 Sect AR/Engr-2025/30
Open Tender
Civil Works
Works
365 days
Bn HQ, Shangshak
As per tender refer
2 documents required · 2 mandatory
₹1,500
DIG AR, HQ 10 Sector AR
₹1.7 L
16 Dec 2025
16 Sept 2025
7 Oct 2025
16 Sept 2025
6 Oct 2025
16 Sept 2025
stage.html
html • 0.03 MB
technical_922556.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.56 MB
BOQ_922556.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .