| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC GOSWAMI COLONY PO UDAYAN VIHAR DISTT KAMRUP ASSAM 781171 | KAMRUP METRO | ASSAM | 781171 | L1 | Accepted-AOC Validated (Lowest bidder) | |
| 2 | L2₹21.5 L+₹1.6 L (7.89%)Rejected-Finance HOUSE NO 29 A SIJUBARI NIZARA PATH PO PS HATTIGAON GUWAHATI 38 | KAMRUP METRO | ASSAM | 781038 | L2 | Rejected-Finance Not validated (Other than lowest bidder) | |
| 3 | L3₹22.0 L+₹2.1 L (10.5%)Rejected-Finance NIL | L3 | Rejected-Finance Not validated (Other than lowest bidder) | |
| 4 | L4₹22.3 L+₹2.4 L (12.2%)Rejected-Finance MES COLONY KUMBHIGRAM AIRPORT CACHAR ASSAM 788109 | KUMBHIGRAM | CACHAR | ASSAM | 788109 | L4 | Rejected-Finance Not validated (Other than lowest bidder) | |
| 5 | L5₹23.0 L+₹3.1 L (15.6%)Rejected-Finance OIL INDIA LTD GATE NO 02 PO UDAYAN VIHAR GUWAHATI ASSAM | KAMRUP METRO | ASSAM | 781001 | L5 | Rejected-Finance Not validated (Other than lowest bidder) |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
5 Sept 2024, 6:00 pmClosed
GE GUWAHATI
GE GUWAHATI, PO SATGAON, DISTT KAMRUP - 781027
REPAIR/MAINTENANCE OF SEWAGE TREATMENT PLANT, INCINERATOR, FIRE FIGHTING, LAUNDRY AND MISC WORKS UNDER GE GUWAHATI
2024_MES_666656_1
GE/GUW/30/8458 OF 2024-25
Open Tender
Civil Works
Item Rate
180 days
GUWAHATI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE GUWAHATI
₹40,000
Yes
20 Nov 2024
19 Jul 2024
7 Sept 2024
19 Jul 2024
5 Sept 2024
2 Aug 2024
19 Jul 2024 - 26 Jul 2024
Amount
Disconnecting/taking down carefully of vertical automatic instant steaming packaged oil fired steam boiler, steam capable of generating 600 kg/hrs of steam F&A 100 c up to a maximun pressure of 15 kg/sqcm duly disconnecting all electrical and mechanical connection for overhaulting including taking down the boiler with the help of crane (2 ton capacity), keeping seperately for dismantling and opening the oil fired steam boiler for serving, cleaning using hand hydraulic pump set, repair/replkacement of damaged/defectve spares, including welding to leakage sleaves coil, replacement of cables etc of Srl No -PX 22, 213 : 06 and PX 01-06-07, Model- PX 06 (Make-Primex Pvt Ltd), re-hoisting the boiler and mounting on existing foundation with the help of crane and re-connecting all disconnected electrical and mechanical connection and reassembling the boiler after replacement of damaged/defective spares including testing, commissioning complete all as specified and directed. (Note : spare parts as required shall be measured and paid separately as " Supply only " here in after)
Supply only lgnition electrode
Supply only lgnition transformer
Supply only 3 pin adopter with cable of approximate length 0.5 m for Ignition Transformer
Supply only Nozzle
Supply only photo cell
Supply only temperature controller cum indicator
Supply only sequence controller cum indicator
Supply only feed pump (As per sample)
Supply only contactor 16A (BARATIA CUTTLER)
Supply only over load relay 13 to 20 Amp
Supply only 15 mm dia hose heavy duty with check nuts
Supply only gasket
Supply only Asbestos rope of size 1/2"
Supply only indicator lamp
Supply only V belt suitable for water pump
Supply only steam coil (as per sample)
Supply only blown down valve
Supply only safety valve 15 mm dia
Descaling, complete overhaulting, hydraulic test, feed pump (Make- ASPEE-HTP), repair/replacement of unserviceable materials, reassembling and recommissioning the boiler (PX-06/07) of Mechanical Laundry Plant, complete all as directed. (Note : spare parts as required shall be measured and paid as " Supply only " here in after)
Supply only Descaling compound
Supply only cup washer
Supply only gland washer
Supply only oil ring
Supply only diffuser plate
Supply only Asbestor tape (40mm X 30mm thick), Asbestor rope 1/4", Holdtite liquid, Steam gasket (1M x 1M x 3 mm thick), Teflon tape 3/4", wire brush, welding rod-109, & pH paper - 01 book complete
Taking down carefully, duly disconnecting all electrical and mechanical connections burnt out unserviceable water pump motor of capacity 3.0 HP Mechanical Laundry plant, rewinding the burnt out winding with same gauge and data of supper enamelled copper conductor, varnishing the rewinded stator, winding properly and heating the same on heat chamber till achieving the perfect insultation resistance (minimum 06 Ohms) re-assembling the motor and refixing the same on existing foundation including replacement of damaged/worn out spares complete all as specified and as directed. (Note : spare parts as required shall be measured and paid as " Supply only" here in after)
Supply only motor shaft bearing
Supply only water seal
Supply only motor shaft locking pin
Supply only Nozzle
Dismantling and taking down carefully duly disconnecting the electrical and mechanical connections of Blower of steam boiler (Srl No 701 & 702) from Mechanical Laundry plant (Make- Snow white Pvt Ltd), for cleaning and servicing including necessary repair/maintenance by greasing welding works wherever required cleaning of moving parts tightening nuts and bolts and necessary electrical connections including testing complete and replacement of damaged unserviceable spares as required and as directed by Engr-in-Charge. (Note : spare parts as required shall be measured and paid "Supply only" here in after)
Supply only blower shaft bearing
Supply only blower fan locking pin
Dismantling and taking down carefully washing machine of capacity 50 Kg alongwith control from Mechanical Laundry plant duly disconnected the electrical and mechanical connections, for cleaning and servicing including necessary repair/maintenance by greasing welding works wherever required, cleaning of moving parts and inner perforated drum, tightening nuts and bolts and necessary electrical connections including testing complete and replacement of damaged unserviceable spares as required and as directed. (Note : spare parts as required shall be measured and paid "Supply only" here in after)
Supply only Reversing timer
Supply only drain valve solenoid
Supply only flange coupling with coupling tyre
Supply only V belt C-2850/C110 Make : Fenner
Supply only temperature controller cum indicator
Supply only water valve
Supply only indicator lamp
Supply only contactor 16 A
Supply only citation
Supply only over load relay coil
Supply only over load protector 3.8 to 6.0 Amps
Supply only MS Nut bolts big
Supply only Nut bolts small
Supply only door handle set assembly
Supply only PVC transparent water level pipe with check Nuts. (As per sample)
Dismantling and opening carefully hand press of Mechanical Laundry plant and re-fixing the same after through checking/repairing including replacement of insulating material as required.
Supply and fixing in repair, heating element of 1000 watts of Mechanical Laundry plant of any capacity complete all as directed
Dismantling and taking down carefully, hydro extractor (50 Kg capacity) of Mechanical Laundry plant (plant Make- Snow white Pvt Ltd) and re-fixing the same after replacement/maintenance of necessary spares and resetting the moving parts including necessary welding the drum wherever required, tightening the nuts and bolts including connecting the electrical connections etc and replacement of unserviceable spares as required and directed. (Note : spare parts ad required shall be measured and paid as "supply only" here in after)
Supply only 'V' belt, Make-Fenner
Supply only clutch spring
Supply only oil seal
Supply only break lining with rivets
Supply only suspension rod with nut
Taking down carefully, Hydro extractor coupled burnt out motor of capacity 10 HP, 440 V, 3 phase from Mechanical Laundry plant duly disconnected the electrical and mechanical connections, transporting the same to civil workshop and opening into the motor checking/sort out the defective spares and taking out the burnt put stator winding from the motor re-winding the motor with suitable size of copper enamelled conductor, varnishing the re-winded stator and heating up the same on heating chamber heating up till obtained the insulation valve minimum 6 Ohm, reassembling the motor after replacement of the damage/defective spares, transporting the same from local workshop to site and re-installed the same on existing foundation including testing and commissioning complete all as directed. (Note : spare parts as required shall be measured and paid as "supply only" here in after)
Supply only motor bearing
Supply only shaft locking pin
Supply only 'V' belt, Make-Fenner
Supply only Gear Oil (Make : Castro)
Material and Labour for applying plaster of paris over the asbestor rope complete all as specified and directed
Supply and fixing in repair, water pressure guage of 225 lbs/Sq inch of Mechanical Laundry plant complete as specified and directed
Disconnecting and dismantling of defective gearbox of various machines of Mechanical Laundry plant from its base for cleaning, servicing, greasing and re assembling the same and re-erection/install in its original base including refilling of gear oil and testing complete all as specified and directed
Repair/maintenance of steel water treatment plant of capacity 5 kg/Sqcm, by washing cleaning and removing all deposited scales dirts etc and replacement of unserviceable spares complete all as specified and as directed. (Note : spare parts as required shall be measured and paid as "supply only" here in after)
Supply only polyster cation resin
Supply only ball valve 25 mm dia mild steel
Supply only common salt
Supply only Air filter
Supply only safety control valve
Supply only V Belt
Material and Labour for complete overhauling of centrifugal horizontal filter feed pumps and motor set (Make- Kirloskar), 5 HP capacity 3 phase, 415 volts by dismantling and opening completely, cleaning internal parts thoroughly replacing unserviceable minor parts like nuts, bolts, washers, packing, terminal plate, cable lugs including insulating materials, varnishing, reassembling, reinstalling and testing complete all as directed. (Note: Replacement of major parts shall be measured and paid seperately as supply only).
Supply only motor bearing
Supply only pump bearing
Supply only shaft locking pin
Supply only pump impeller
Supply only impeller casing
Supply only shaft
Supply only motor PVC fan handle
Material and Labour for complete overhauling of air blower/Air compressor of STP plant of capacity 250m3/hr at 5000 mmwc and motor of 10 HP capacity 3 phase, 415 volts by dismantling and opening completely, cleaning internal parts thoroughly, replacing unserviceable minor parts like nuts, bolts, washers, packing, terminal plate, cable lugs including insulating materials, varnishing, reassembling, reinstalling and testing complete all as directed. (Note: Replacement of major parts shall be measured and paid seperately as supply only).
Supply only motor bearing
Supply only compressor bearing
Supply only shaft locking pin
Supply only V belt
Cleaning of main collection sewage well/sump (Over all size of Sump/well 4.80 M dia & 6.00 M depth) of STP plant by taking out all sludge in liquid/ semi liquid /hardened stage as per actual site condition by sewerage extraction pumps of suitable capacity /appropriate machanical means, removing and depositing in a pit, sprinkling of bleaching powder and covering with earth to a depth not less than 30 cm after complete setting of sludge content/rubbish/debris including necessary excavation and earthwork to a distance as directed. Note: Contractor shall ensure that proper hygienic condition is maintained during operation of this item to avoid any health hazards.
Supply and fixing, in repair, 80 mm bore, Cast iron foot valve with gun metal working parts, heavy duty, flanged end including rubber gaskets, bolts, nuts, washers etc for jointing and connections complete as specified and directed .
Supply and fixing, in repair, 100 mm bore, Cast iron foot valve with gun metal working parts, heavy duty, flanged end including rubber gaskets, bolts, nuts, washers etc for jointing and connections complete as specified and directed .
Supply and fixing, in repair, 150 mm bore, Cast iron foot valve with gun metal working parts, heavy duty, flanged end including rubber gaskets, bolts, nuts, washers etc for jointing and connections complete as specified and directed .
Supply and fixing, 110 mm outer dia, 3-layer, PP-R (Polypropylene Random Co-polymer) concealed pipes SDR 7.4 (PN 16) UV stabilized and anti microbial fusion welded having thermal stability for hot and cold water supply including all PP-R plain and brass threaded polypropylene random fittings laid in trenches including taking down or taking up the old pipe complete as specified and directed.
Supply and fixing, in repair, DOL starter for 5 HP sewage transfer motor complete all as specified and directed
Supply and fixing, in repair, DOL starter for 7.5 HP sewage transfer motor complete all as specified and directed
Supply and fixing, in repair, DOL starter for 10 HP sewage transfer motor complete all as specified and directed
Material and labour for checking leakage of ERW Pipe, cutting wherever required, welding / soldering of joint of pipe complete all as specified and directed.
Supply and fixing, in repair, 50mm bore, Gun metal Globe or Gate Valves high pressure with crutch or butterfly handle screwed both ends for iron pipe or unions complete for fire fighting all as specified and as directed.
Supply and fixing, in repair, fire hydrant valve, gun metal, single headed, 63mm bore, ISI Marked complete all as specified and directed.
Supply and fixing, in repair, Hose of length 15m length. Hose shall be of Synthetic fibre, circular woven jacketed, treated against rot, Working Pressure 12 kg/sq cm, Burst pressure, 36 kg/sq cm. Coupling shall be male and female parts, gunmetal, 63 mm. (2 1/2") size, heavy quality bearing conforming to IS.903 with IS Mark complete all as specified and directed.
Material and labour for painting to MS box of size of size 90cmX45cmX15cm with two coats of synthetic enamelled paint over a coat of red oxide primer including making good the broken parts by welding all as specified and directed .
M/S SEWAK SINGH (BID ID -3086074)
SANJAY KRISHNA HAZARIKA (BID ID -3084605)
Goswami Traders (BID ID -3084560)
S. R. TRADING (BID ID -3085975)
TONMOY DAS (BID ID -3086613)
SHANKAR ENTERPRISE (BID ID -3086713)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .