Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2,701
Closing Date
24 Feb 2026, 3:00 pmClosed
The Village President
The Village President
Construction of School Toilet at PUE School at Melkalathur Panchayat
2026_RDTN_664882_1
A2/751/2025
Open Tender
Civil Works
Item Rate
120 days
Panchayat Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,701
24 Feb 2026
23 Feb 2026
24 Feb 2026
23 Feb 2026
24 Feb 2026
23 Feb 2026
Construction of School Toilet at PUE School at Melkalathur Panchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc.,
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.)
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Rainforcement Cement Concrete 1:1 1/2:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Plastering with CM 1:3, 10mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and all labour charges for mixing, laying, curing etc complete for 10 cumand conveyance of all materials to site
Steel door 0.75 x 1.80 m
Steel door 0.9 x 2.0 m
RCC Jolly 0.45 x 0.30 m
Cost and Supply of Water Closet,PVC Pipe Including all cost and convenyance for etc complete IWC
Cost and Supply of Water Closet,PVC Pipe Including all cost and convenyance for etc complete EWC
1000 litre HDPE Tank.
Painting Two coat approved Plastic Emulsion over the plastered surface including cost and all other charges etc.,
Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc.,
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works.
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.04 MB
BOQ_798476.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .