Loading…
Loading…
Tender Value
₹90.1 L
EMD Value
₹1.8 L
Closing Date
28 Aug 2026, 11:00 am5d left
Divisional Soil conservation officer hoshiarpur
Room no. 440 to 444 ,4th floor admin compex hoshiarpur
Construction of Stone Masonry retaining wall for pond inlet structure and Crate wire structure at Vill Beh Chur BehDarya Badala Beh Kito Repur Beh Jogan Chamuhi Beh Mawa Rakri Gaggar Parelian and Narnaul under Sub DivisionTalwara
2026_DOA_173391_2
DSWC/HSP/2026-2027/14
Open Tender
Civil Works
Percentage
90 days
Different village of Subdivision talwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.8 L
21 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/HSP/2026-2027/14
Construction of Stone Masonry Retaining wall for pond, Inlet Structure and Crate Wire Structures at Vill. Beh Chur, Beh Darya, Badala, Beh Kito, Repur, Beh Jogan, Chamuhi, Beh Mawa, Rakri, Gaggar, Parelian and Narnaul under sub division Talwara
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost 9007900
Quoted by Contractor (as %age less of estimated Amount) Less (-%) Amount Quoted
1. Stone Masonry Retaining wall for pond protection & Crate Wire Structure
Village Beh Chur Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 12854 dated 04-08-2026 Amount = 10,66,800/- o/o CCS Punjab, Chandigarh
1.1 Stone Masonry Retaining wall for pond protection
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 44 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 8.8 Per Cum 3303.78
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 35.2 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 48 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 1 Per Cum 4929.33
6 Carriage of material 131.03 Per Cum 0.00_
1.2 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 84 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 753 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 753 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 162 Per Cum 1458.04
5 Carriage of material 162 Per Cum 0.00_
1.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (A) SAY = 1066800
2. Stone Masonry Retaining wall for pond protection & Crate Wire Structure
Village Beh Darya Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 12842 dated 04-08-2026 Amount = 10,42,000/- o/o CCS Punjab, Chandigarh
2.1 Stone Masonry Retaining wall for pond protection
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 45 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 9 Per Cum 3303.78
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 36 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 42.19 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 1.13 Per Cum 4929.33
6 Carriage of material 124.48 Per Cum 0.00_
2.2 Stone Masonry Retaining wall for pond protection
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 16.5 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 3.3 Per Cum 3303.78
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 13.2 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 17.4 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 0.38 Per Cum 4929.33
6 Carriage of material 48.3 Per Cum 0.00_
2.3 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 48 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 446.5 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 446.5 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 96 Per Cum 1458.04
5 Carriage of material 96 Per Cum 0.00_
2.4 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (B) SAY = 1042000
3. Stone Masonry Bank Protection wall for pond & Crate Wire Structure
Village Badala Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 12846 dated 04-08-2026 Amount = 10,23,300/- o/o CCS Punjab, Chandigarh
3.1 Stone Masonry Bank Protection wall for pond
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 132 Per Cum 38.98
2 Compacting original ground below embankment. Loosening, levelling and compacting ground below embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 30 Per Cum 32.45
3 C.C. 1:6:12 in foundation with 40 mm gauge stone aggregate CSR 10.9(b)(i) as per PWD specifications. 43.02 Per Cum 3475.5
4 Squared Rubbled Masonary 1:5 in foundation and plinth CSR 12.17 80.9 Per Cum 5602.51
5 Grouting Stone filling or pitching with mortar as per CSR 23.45 (b) 179.6 Per sqm 181.2
6 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 4 Per Cum 4929.33
7 Carriage of material 236.41 Per Cum 279.23
3.2 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 50.4 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 451.8 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 451.8 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 97.2 Per Cum 1458.04
5 Carriage of material 97.2 Per Cum 279.23
3.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (C) SAY = 1023300
4. Crate Wire Structure
Village Beh Kito Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2101 dated 07-08-2026 Amount = 7,01,100/- o/o COS, SAS Nagar
4.1 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 120 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 1059.5 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 1059.5 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 228 Per Cum 1458.04
5 Carriage of material 228 Per Cum 0.00_
6 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (D) SAY = 701100
5. Stone Masonry Retaining wall & Crate Wire Structure
Village Repur Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2109 dated 07-08-2026 Amount = 7,48,400/- o/o COS, SAS Nagar
5.1 Stone Masonry Retaining wall
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 3 Per Cum 3303.78
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 12 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 16.88 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 0.375 Per Cum 4929.33
6 Carriage of material 45.43 Per Cum 279.23
5.2 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 97.2 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 850.25 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 850.25 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 183 Per Cum 1458.04
5 Carriage of material 183 Per Cum 279.23
5.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Wall painting 1 no 1500
TOTAL (E) SAY = 748400
6. Crate Wire Structure
Village Beh Jogan Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2113 dated 07-08-2026 Amount = 4,91,500/- o/o COS, SAS Nagar
6.1 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 84 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 753 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 753 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 162 Per Cum 1458.04
5 Carriage of material 162 Per Cum 279.23
6 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (F) SAY = 491500
7. Crate Wire Structure
Village Chamuhi Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2105 dated 07-08-2026 Amount = 6,00,100/- o/o COS, SAS Nagar
7.1 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 102 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 906.25 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 906.25 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 195 Per Cum 1458.04
5 Carriage of material 195 Per Cum 0.00_
6 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (G) SAY = 600100
8. Crate Wire Structure
Village Beh Mawa Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2103 dated 07-08-2026 Amount = 5,82,000/- o/o COS, SAS Nagar
8.1 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 96 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 893 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 893 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 192 Per Cum 1458.04
5 Carriage of material 192 Per Cum 279.23
6 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (H) SAY = 582000
9. Crate Wire Structure
Village Rakri Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2111 dated 07-08-2026 Amount = 4,91,500/- o/o COS, SAS Nagar
9.1 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 84 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 753 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 753 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 162 Per Cum 1458.04
5 Carriage of material 162 Per Cum 279.23
6 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (I) SAY = 491500
10. Stone Masonry Retaining wall & Crate Wire Structure
Village Gaggar Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2107 dated 07-08-2026 Amount = 6,56,000/- o/o COS, SAS Nagar
10.1 Stone Masonry Retaining wall
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 30 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 6 Per Cum 3303.78
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 0.75 Per Cum 4929.33
4 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 24 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 45 Per Cum 5602.51
10.2 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 47.25 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 416.5 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 416.5 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 89.25 Per Cum 1458.04
TOTAL (J) SAY = 656000
11. Stone Masonry Retaining wall & Inlet Structure of pond
Village Parelian Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 2140 dated 07-08-2026 Amount = 6,22,200/- o/o COS, SAS Nagar
11.1 Stone Masonry Retaining wall
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 33.8 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 6.76 Per Cum 3303.78
3 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 0.78 Per Cum 4929.33
4 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 27.04 Per Cum 5602.51
5 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 46.93 Per Cum 5602.51
11.2 Inlet structure of Pond
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 33.56 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 10.41 Per Cum 3303.78
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 16.59 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 2.88 Per Cum 5602.51
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 7.22 Per Cum 4929.33
TOTAL (K) SAY = 622200
12. Stone Masonry Retaining wall for pond protection & Crate Wire Structure
Village Narnaul Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 13003 dated 06-08-2026 Amount = 9,83,000/- o/o CCS Punjab, Chandigarh
12.1 Stone Masonry Retaining wall for pond protection
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 48 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(i) as per PWD specifications. 9.6 Per Cum 3303.78
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 38.4 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 as per PWD specifications. 71.4 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 1 Per Cum 4929.33
6 Carriage of material 169.47 Per Cum 279.23
12.2 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 42 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 376.5 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 376.5 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 81 Per Cum 1458.04
5 Carriage of material 81 Per Cum 279.23
12.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board 6'X4' Complete in all respect 1 no 3000
TOTAL (L) SAY = 983000
GRAND TOTAL (A+B+C+D+E+F+G+H+I+J+K+L) =
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
DNIT14.pdf
Tender Documents • 0.49 MB
finbid14.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].