Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹130 Cr
Closing Date
16 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Amit Kumar
Office of Chief General Manager (Proj) Commercial, Tender & Claims, Ispat Bhawan, Bokaro Steel Plant
Secondary Emission Control in Converters of SMS-II at Bokaro Steel Plant (BSL)
1005
T&C(M)/A6330/AK/675 Dated: 12.10.2023
OTE-INDG
TurnKey
Bokaro, Jharkhand
• The bidder (sole or consortium) should have carried out design/ engineering, supply, erection/ supervision of erection, commissioning/ supervision of commissioning of at least one new Electro Static Precipitator (ESP) based Secondary Emission Control (SEC) System with dog house/ Elephant house for min. gas/ fume capacity 5,00,000 m3/h in the last 15 years for BOF/ LD Converter in Steel Melting Shop of Steel Plant, either under the same or different work orders as on the date of NIT. The SEC System should have operated for at least one year after commissioning before the date of NIT.
• In case the bidder is in a consortium: a. One or more of the consortium members (maximum three consortium members are permitted) can either individually or together, fulfil the criteria of Para-1 above. b. Foreign (Non-Indian) bidder can also be the consortium member in domestic open tender. However, payment will be made in Indian Rupees (INR) only c. The responsibility of design / engineering, supply, erection /supervision of erection and commissioning should be taken up in the responsibility matrix by the respective members who fulfil the criteria as per para-1. d. For taking up the remaining jobs as per responsibility matrix, the respective members should have commensurate experience in any project of any steel plant. e. Leader of consortium should be the member having maximum job or share of work in value terms.
• The average annual financial turnover of the bidder during any three consecutive financial years ending March’23 shall be at least Rs. 65 crore (Rupees Sixty five Crore only). In case of consortium bidding, Minimum Turnover requirement for each consortium member=Rs 65crore (or equivalent in foreign currency) ×% of scope of work in value terms of total contract value declared in Consortium Agreement (MoA). c) Audited annual financial reports for the three (3) consecutive financial years considered (as mentioned in (a) in support of the above shall be submitted by the bidder (sole) or by each consortium member (in case of consortium bidding). d) Net worth of each member of the consortium should be positive in the preceding financial year, as per audited annual accounts. For Consortium Bidding the same applies to all parties. Financial Year means, the accounting year accepted by the prevailing law of respective Country.
• In case any Indian Bidder does not satisfy the technical eligibility criteria, stipulated at Sl. No. 1 above on its own, the bidder can also submit their bid based on the technical strength of its Holding company/ any of its Holding Company’s subsidiaries provided the bidder along with its Holding company/ any of its Holding Company’s subsidiaries fulfils the eligibility criteria mentioned under Sl. No. 1 above.Additionally, the Bidder should have experience of erection/ supervision of erection, commissioning/ supervision of commissioning of any project of minimum value of 50 Crores in steel plant.
• Bidder should submit self-declaration in the prescribed format (Annexure-7ofITB of section II of SBD) that No Corporate Insolvency Resolution/Liquidation Process have commenced against them under National Company Law Tribunal (NCLT). For Consortium Bidding the same applies to all members of the consortium. In cases of Consortium, bidding, a self-declaration shall be submitted individually by each member of the Consortium in the prescribed format (Annexure-7 of ITB of section II of SBD) that No Corporate Insolvency Resolution/Liquidation Process have commenced against them under National Company Law Tribunal (NCLT).
32 documents required · 32 mandatory
https://zoom.us/j/99957867375?pwd=VmJraG5VUUdoYWF2Qi9tQVdoalpGUT09
16 Mar 2024
13 Oct 2023
16 Mar 2024
13 Oct 2023
16 Mar 2024
13 Oct 2023
30 Oct 2023
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
1697088600115_4. TS R2_4784-1 Secondary Emission.pdf
NIT • 4.60 MB
1697088966530_UNDERGROUND SURVEY REPORT.pdf
NIT • 0.61 MB
1697089036424_P155_FINAL REPORT_SMS II_BOKARO STEEL PLANT.pdf
NIT • 5.11 MB
1697089218687_SECONDARY EMISSION CONTROL IN CONVERTERS OF SMS-II- UNDERGROUND SURVEY.pdf
NIT • 0.77 MB
1697089236986_SECONDARY EMISSION CONTROL IN CONVERTERS OF SMS-II-CONTOUR & SPOT LEVEL.pdf
NIT • 1.12 MB
1697094188776_5. SBD - 2020 amended.pdf
NIT • 5.46 MB
1697112246343_INTEGRITY PACT (12.10.2023).PDF
NIT • 0.54 MB
5. SBD - 2020 amended.pdf
NIT • 5.46 MB
3. Eligibility Criteria.pdf
NIT • 0.41 MB
1. NIT 675.pdf
NIT • 0.43 MB
2.BDS 675.pdf
NIT • 0.41 MB
4. TS R2_4784-1 Secondary Emission.pdf
NIT • 4.60 MB
6. Annexure C On line RA General Rules and Guide lines.pdf
NIT • 0.20 MB
7. Annexure-A Format for Basic Information.pdf
NIT • 0.01 MB
8. Annexure-B_SRM_Mandate_Form.pdf
NIT • 0.45 MB
9. Annexure - D Format for Certificatedeclaration.pdf
NIT • 0.07 MB
Final report for the Project AREA SURVEY & SOIL INVESTIGATION (PKG IIA) & Underground mapping(Pkg IIB) OF SECONDARY EMISSION ( New location )of SMS -II ,BSL.zip
NIT • 8.19 MB
INTEGRITY PACT (12.10.2023).PDF
NIT • 0.54 MB
Corrigendum_addendum - EC.pdf
NIT • 0.10 MB
Clarification to Pre Bid Queries.zip
NIT • 8.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .