| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.2 LAccepted-AOC NEAR RADHA KRISHNA MANDIR VIKASH BHAWAN JAYANT SINGRAULI MP PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | L-1 | Accepted-AOC Accepted as L1 bidder basis in Open Tender Enquiry | |
| 2 | Rejected-Technical DHOTI VINDHYANAGAR WAIDHAN DISTT SINGRAULI MP | WAIDHAN | SINGRAULI | MP | - | Rejected-Technical Rejected as not L-1 | |
| 3 | Rejected-Technical KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | - | Rejected-Technical Rejected as not L-1 |
| Sl No | Description | Qty | Unit | VISHAL ENGINEERING WORKS L1 | SHASHI ENGINEERING WORKS L3 | RD CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work:Repairing/co-axial boring of Supporting Wheel Shaft housing and replacement & fitment of all 16 Nos. Supporting Wheel Assembly of both sides (LHS & RHS) of undercarriage in respect of WK-20 TYHI shovels (Maruti & Mahaveer) working at Nigahi Project. Maximum likely manpower to be deployed per shift : 12 No ( 01 Highly Skilled , 04 Skilled , 04Semi-Skilled , 03 Unskilled ) | ||||||
| 2.00Note : Welding electrode, Gauging electrode and Industrial gases as per requirment will be provided by NCL. | ||||||
| 3.00 | Cost/ charges for removal of Supporting Wheel Assembly (16 Nos.) for LHS and RHS for each Shovel including labour charges, contractor profit and any other misc. charges. (labour consisting of Skilled Fitter , skilled Welder, Semi-skilled and Unskilled Helper manpower to be deployed as per job requirement). Total job for 2 nos. shovel. | 2 | job | 1,65,858 ₹3,31,716 Lowest | 1,76,000 ₹3,52,000 | 2,55,000 ₹5,10,000 |
| 4.00 | Cost / Charges for co-axial boring of shaft/pin housings of 16 Nos. supporting wheel Aseembly for each shovel. Volume of one number shaft / pin housing to be line bored is 652.052 Cu. Cm. Total 16 nos. housing of supporting wheel assembly to be co-axial bored. Job of 2 shovel, hence Total 32 Nos pin housing boring work. (652.052x32=20865.664 cu cm (Track rollers LHS and RHS) | 20,865.66 | Cucm. | 65.05 ₹13,57,311.44 | 68 ₹14,18,865.15 | 57 ₹11,89,342.85 Lowest |
| 5.00 | Cost/ charges for fitement of all 16 Nos. supporting wheel Aseembly with grinding and washer setting for LHS and RHS(after co-axial boring of housings) including labour charges, contractor profit and any other misc. charges (labour consisting of Skilled Fitter , skilled Welder, Semi-skilled and Unskilled Helper manpower to be deployed as per job requirement). Total Job for 2 shovel. | 2 | job | 1,99,029 ₹3,98,058 Lowest | 2,25,000 ₹4,50,000 | 2,55,000 ₹5,10,000 |
| 6.00 | Labour charges/cost for Highly skilled supervisor for the supervision of complete above mentioned job as per scope of work for 01 shovel. Total job for 2 shovels. | 2 | job | 61,908 ₹1,23,816 Lowest | 65,000 ₹1,30,000 | 1,85,500 ₹3,71,000 |
| 7.00 | Hire charges for hydraulic jack (300Ton) - 04 Nos. for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels. | 2 | job | 1,20,000 ₹2,40,000 | 1,35,000 ₹2,70,000 | 28,000 ₹56,000 Lowest |
| 8.00 | Hire charges for welding machine 02 Nos. with all accessories for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels. | 2 | job | 6,000 ₹12,000 Lowest | 9,000 ₹18,000 | 15,000 ₹30,000 |
| 9.00 | Hire charges for gas cutting sets with all accessories for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels. | 2 | job | 1,800 ₹3,600 Lowest | 2,500 ₹5,000 | 8,000 ₹16,000 |
| 10.00 | Hire charges for grinder machine - 02 Nos. with all accessories for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels. | 2 | job | 3,600 ₹7,200 Lowest | 4,500 ₹9,000 | 9,500 ₹19,000 |
Tender Value
₹29.1 L
EMD Value
₹36,400
Closing Date
26 Jun 2025, 11:00 amClosed
GENERAL MANAGER (EXCAVATION)
OFFICE OF GM(EXCV) NIGAHI PROJECT , NCL , PO-NIGAHI , DISTRICT-SINGRAULI , M.P.
Repairing/co-axial boring of Supporting Wheel Shaft housing and replacementANDfitment of all 16 Nos. Supporting Wheel Assembly of both sides (LHSandRHS) of undercarriage in respect of WK-20 TYHI shovels (MarutiANDMahaveer) working at Nigahi Proje
2025_NCL_336803_1
NGH/EXCV/TENDERS/25-26/024
Open Tender
Excavation Department Work
Item Rate
60 days
NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹36,400
17 Aug 2025
6 Jun 2025
27 Jun 2025
6 Jun 2025
26 Jun 2025
7 Jun 2025
6 Jun 2025 - 14 Jun 2025
Amount
Scope of Work:Repairing/co-axial boring of Supporting Wheel Shaft housing and replacement & fitment of all 16 Nos. Supporting Wheel Assembly of both sides (LHS & RHS) of undercarriage in respect of WK-20 TYHI shovels (Maruti & Mahaveer) working at Nigahi Project. Maximum likely manpower to be deployed per shift : 12 No ( 01 Highly Skilled , 04 Skilled , 04Semi-Skilled , 03 Unskilled )
Note : Welding electrode, Gauging electrode and Industrial gases as per requirment will be provided by NCL.
Cost/ charges for removal of Supporting Wheel Assembly (16 Nos.) for LHS and RHS for each Shovel including labour charges, contractor profit and any other misc. charges. (labour consisting of Skilled Fitter , skilled Welder, Semi-skilled and Unskilled Helper manpower to be deployed as per job requirement). Total job for 2 nos. shovel.
Cost / Charges for co-axial boring of shaft/pin housings of 16 Nos. supporting wheel Aseembly for each shovel. Volume of one number shaft / pin housing to be line bored is 652.052 Cu. Cm. Total 16 nos. housing of supporting wheel assembly to be co-axial bored. Job of 2 shovel, hence Total 32 Nos pin housing boring work. (652.052x32=20865.664 cu cm (Track rollers LHS and RHS)
Cost/ charges for fitement of all 16 Nos. supporting wheel Aseembly with grinding and washer setting for LHS and RHS(after co-axial boring of housings) including labour charges, contractor profit and any other misc. charges (labour consisting of Skilled Fitter , skilled Welder, Semi-skilled and Unskilled Helper manpower to be deployed as per job requirement). Total Job for 2 shovel.
Labour charges/cost for Highly skilled supervisor for the supervision of complete above mentioned job as per scope of work for 01 shovel. Total job for 2 shovels.
Hire charges for hydraulic jack (300Ton) - 04 Nos. for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels.
Hire charges for welding machine 02 Nos. with all accessories for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels.
Hire charges for gas cutting sets with all accessories for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels.
Hire charges for grinder machine - 02 Nos. with all accessories for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels.
Hire charges for chain pulley block (10 Ton) with all accessories for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels
Hire charges for misc tools and tackles for above mentioned job as per scope of work for 01 shovel complete repair work. Total job for 2 shovels
Total impact of GST for the purpose of CTC
RD CONSTRUCTION COMPANY (BID ID -1163317)
SHASHI ENGINEERING WORKS (BID ID -1163471)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .