Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC BEHIND OF PAWAN TALKIES ROAD KORBA CG 495678 | 495678 | L1 | Accepted-AOC Technically and Financially eligible L1 Bidder | |
| 2 | L2₹7.8 L+₹48,340 (6.65%)Rejected-Finance ZONE 8 KHATA NO 842 WARD NO 67 JUNGLE SIDE DR CHANDRA GALI BANKI MONGRA KORBA CG 495447 | KORBA | CHHATTISGARH | 495447 | L2 | Rejected-Finance Not L1 Bidder | |
| 3 | L3₹7.9 L+₹65,281.60 (8.98%)Rejected-Finance Q NO A 29 POWER CITY JAMNIPALI KORBA CG 495450 | KORBA | CHHATTISGARH | 495450 | L3 | Rejected-Finance Not L1 Bidder | |
| 4 | L4₹8.1 L+₹83,801.60 (11.5%)Rejected-Finance FILTER CHOWK GAYATRI NAGAR KORBA C G PIN CODE 495683 | KORBA | CHHATTISGARH | 495683 | L4 | Rejected-Finance Not L1 Bidder | |
| 5 | L5₹9.3 L+₹2.0 L (27.4%)Rejected-Finance 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | L5 | Rejected-Finance Not L1 Bidder |
Tender Value
₹17.6 L
EMD Value
₹22,000
Closing Date
4 May 2024, 5:00 pmClosed
STAFF OFFICER (CIVIL) KORBA AREA
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG), Mo-9425533108/ 7587390644
Cleaning of garland drains, nallah and bund protection Works (pre monsoon and during monsoon) for 06 months at Saraipali OCP.
2024_SECL_306881_1
SECL/GM/KA/C/e-Tender/24-25/02 Dt. 22.04.2024
Open Tender
Civil Works - Buildings
Item Rate
180 days
Office of the General Manager, Korba Area, SECL
As per NIT
3 documents required · 3 mandatory
₹22,000
6 Jun 2024
23 Apr 2024
6 May 2024
24 Apr 2024
4 May 2024
24 Apr 2024
24 Apr 2024 - 27 Apr 2024
Amount
CIVIL PART
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying of empty cement bags filled with OB/earth 0.03 cum (minimum) duly stitched and placed in shape and size as per instruction of EIC.
Total impact of GST for the purpose of CTC
MOKSHA CONSTRUCTION
ANIRUDH KUMAR CHOUDHARY
Yash Engineers and Contractor
SANTOSH AGRAWAL
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_318039.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .