Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2737.9 CrAdmitted-Finance D 13 R D AGA ROAD MIDC INDUSTRIAL AREA CHINCHWAD PUNE PUNE MAHARASHTRA 411019 | PUNE | MAHARASHTRA | 411019 | L1 | Admitted-Finance | |
| 2 | L2₹3178.2 Cr+₹440.3 Cr (16.1%)Admitted-Finance 02 ANNEXE 2ND FLOOR RAMACHANDRAPURAM HYDERABAD 500032 INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500032 | L2 | Admitted-Finance | |
| 3 | L3₹3680.2 Cr+₹942.3 Cr (34.4%)Admitted-Finance 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BHEL L2 | Isgec Heavy Engineering Limitd L3 | Thermax Limited L1 |
|---|---|---|---|---|---|---|
| 1.00Project Management, Consistency Checks, Residual Process Engineering, Detailed Design Engineering including HAZOP/SIL Study & Other Safety Studies as mentioned in Bidding Documents, underground scanning, Site enabling jobs, Soil Investigation including additional GPR investigation if any, Ground improvement required if any, Piling works, Demolition/ Dismantling/Re-routing works as applicable and co-ordination for the same with MPMC / Owner, implementation of QRA study recommendations, total Procurement (including chemicals, catalysts, consumables & chemicals required for Pre-commissioning, trial runs and six months continuous running, special Tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Quality Control, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/Site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, Fire-proofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of Sulphur Recovery Block including Substation and Satellite Rack Room for the Plant as detailed in Bidding Documents, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, project data and information handing over specification as per the Bidding Documents, supply of spares with necessary support and services during Defect Liability Period and supply of Chemicals, Catalysts, Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities in accordance with the Bidding Documents | ||||||
| 1.01 | INDIAN CURRENCY PART | 1 | Lumpsum | 13,41,00,00,000 ₹13,41,00,00,000 | 14,75,82,81,900 ₹14,75,82,81,900 | 11,76,00,00,000 ₹11,76,00,00,000 Lowest |
| 1.02 | FOREIGN CURRENCY (Foreign Currency-1) | 1 | Lumpsum | - | 48,58,96,393.17 ₹48,58,96,393.17 Lowest | - |
| 1.03 | FOREIGN CURRENCY (Foreign Currency-2) | 1 | Lumpsum | - | 23,00,31,527.44 ₹23,00,31,527.44 Lowest | - |
Tender Value
Refer Docs
EMD Value
₹1 Cr
Closing Date
19 Jan 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AS PER NIT
TECHNIP INDIA LTD. CHENNAI
EPCC 3 package Sulphur Recovery Block for Numaligarh Refinery Expansion Project AT NRL NUMALIGARH Refinery located at Numaligarh, Assam, India
2021_NRL_650846_1
082176C/NRL/T/SRB/LSTK-3
Global Tenders
Oil/Gas
Lump-sum
850 days
NUMALIGARH
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1 Cr
Yes
ONLINE
17 Feb 2022
30 Sept 2021
20 Jan 2022
30 Sept 2021
19 Jan 2022
8 Dec 2021
26 Oct 2021
180 days
Amount
Project Management, Consistency Checks, Residual Process Engineering, Detailed Design Engineering including HAZOP/SIL Study & Other Safety Studies as mentioned in Bidding Documents, underground scanning, Site enabling jobs, Soil Investigation including additional GPR investigation if any, Ground improvement required if any, Piling works, Demolition/ Dismantling/Re-routing works as applicable and co-ordination for the same with MPMC / Owner, implementation of QRA study recommendations, total Procurement (including chemicals, catalysts, consumables & chemicals required for Pre-commissioning, trial runs and six months continuous running, special Tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Quality Control, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/Site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, Fire-proofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of Sulphur Recovery Block including Substation and Satellite Rack Room for the Plant as detailed in Bidding Documents, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, project data and information handing over specification as per the Bidding Documents, supply of spares with necessary support and services during Defect Liability Period and supply of Chemicals, Catalysts, Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities in accordance with the Bidding Documents
INDIAN CURRENCY PART
FOREIGN CURRENCY (Foreign Currency-1)
FOREIGN CURRENCY (Foreign Currency-2)
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for Completion of Scope of Work as per Bidding Document
INDIAN CURRENCY PART
FOREIGN CURRENCY (Foreign Currency-1)
FOREIGN CURRENCY (Foreign Currency-2)
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAILED ENGINEERING) AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT FOR COMPLETION OF SCOPE OF WORK
INDIAN CURRENCY PART
FOREIGN CURRENCY (Foreign Currency-1)
FOREIGN CURRENCY (Foreign Currency-2)
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT FOR COMPLETION OF SCOPE OF WORK
INDIAN CURRENCY PART
FOREIGN CURRENCY (Foreign Currency-1)
FOREIGN CURRENCY (Foreign Currency-2)
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [ 1 + 2 ]
INDIAN CURRENCY PART
FOREIGN CURRENCY (Foreign Currency-1)
FOREIGN CURRENCY (Foreign Currency-2)
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF FORM SP-1)
BASIC CUSTOM DUTY AND OTHER IMPORT DUTIES ON SUPPLY OF IMPORTED GOODS OTHER THAN THOSE MENTIONED BELOW (FOREIGN COMPONENT OF FORM SP-1)
SWS ON DUTIES QUOTED AT SR. NO. 2.1
IGST/ (CGST +SGST) ON (FOREIGN COMPONENT OF SP-1 + DUTIES AT SR. NO. 2.1 AND 2.2 ABOVE)
GST ON SUPPLY OF SERVICES OFFERED BY INDIAN BIDDER/INDIAN MEMBER OF CONSORTIUM/JV, QUOTED IN INDIAN CURRENCY AND FOREIGN CURRENCY (PART- BREAKUP OF SP-2 CALCULATED BASED ON PERCENTAGE QUOTED IN SP-5)
Description of Work / Item(s)
Amount
AMOUNT OF INDIAN COMPONENT
AMOUNT OF FOREIGN COMPONENT
Description of Work / Item(s)
Amount
GURANTEED UTILITIES FOR EPCC-3 PACKAGE AS PER BIDDING DOCUMENT
GUARANTEED ELECTRICAL POWER CONSUMPTION FOR EPCC-3 PACKAGE
GUARANTEED HP STEAM NET GENERATION FOR EPCC-3 PACKAGE
GUARANTEED MP STEAM CONSUMPTION FOR EPCC-3 PACKAGE
GUARANTEED LP STEAM NET CONSUMPTION FOR EPCC-3 PACKAGE
GUARANTEED FUEL GAS CONSUMPTION FOR EPCC-3 PACKAGE
GUARANTEED COOLING WATER CONSUMPTION FOR EPCC-3 PACKAGE
Isgec Heavy Engineering Limitd
Isgec Heavy Engineering Limitd
Isgec Heavy Engineering Limitd
Isgec Heavy Engineering Limitd
Thermax Limited
Isgec Heavy Engineering Limitd
Isgec Heavy Engineering Limitd
Thermax Limited
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .