| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC AT BARABODIA SALIPUR PO PATAPUR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹24.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹24.6 LSame as L1Rejected-AOC APPOLO VIHAR CHANDRASEKHARPUR BBSR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | ₹24.6 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹24.6 LSame as L1Rejected-AOC AT HARIPUR PO KHADIANGA P S BADACHANA DIST JAJPUR | JAJPUR | ODISHA | ₹24.6 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹24.6 LSame as L1Rejected-AOC AL BARBODIA PO PATPUR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹24.6 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹24.6 LSame as L1Rejected-AOC | ₹24.6 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹24.6 L
EMD Value
₹24,600
Closing Date
13 Apr 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Complete and Renovation of Changing Room of Chauliaganj Play Ground in Chauliaganj in Ward No.42.
2026_ORULB_126616_1
MC(CMC)CTC_Div-IIiNo39/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹24,600
Yes
7 Jul 2026
30 Mar 2026
17 Apr 2026
30 Mar 2026
13 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling and removing R.C.C.columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead | |||||
| 2Dismantling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nuts including stacking of he materials for reuse and removing the debris within 50m lead | |||||
| 3Removing old grading plaster from roof slab, cleaning the surface and removing the debris within 50m lead. | |||||
| 4Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead | |||||
| 5Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead | |||||
| 6Scarping old paint with scapers or sand paper and washing with soap water and scaffolding charges any height. | |||||
| 7Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in super structure . 1st floor | |||||
| 8Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in super structure . 2nd floor | |||||
| 9LINTELS R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | |||||
| 10Chajja R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | |||||
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586562.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_586562.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .