Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.4 LAccepted-Finance 898 85 HARSH NAGAR MAHENE ROAD LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹4.4 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹4.4 L+₹5,801.67 (1.33%)Rejected-Finance 117 O 132 GEETANAGAR KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹4.4 L+₹5,801.67 (1.33%) | L-2 | Rejected-Finance L-2 |
Tender Value
₹4.5 L
EMD Value
₹44,628
Closing Date
5 May 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Construction work of RCC drain in front of the new house of Honble MLA Shri Surendra Maithani ji and in front of Shani Dev Temple double culvert under Zone 06 Ward 91
2026_NNKAN_1144502_1
585/AA-6/2025-26
Open Tender
Civil Works
Percentage
30 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹44,628
20 May 2026
2 May 2026
5 May 2026
2 May 2026
5 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | 57.2 | cum | 215 | ₹12,298 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 Cement: 6 Coarse sand (zone-III): 12 graded Brick aggregate 40 mm nominal size). | 6.16 | cum | 4,380 | ₹26,980.8 |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15* landings, balconles, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finihing and reinforcement: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). | 23.21 | cum | 8,720 | ₹2,02,391.2 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,821.99 | kg | 72 | ₹1,31,183.28 |
| 5 | cartage of earth up to 3.00 km including Loading etc all complete... | 45.76 | cum | 116.96 | ₹5,352.09 |
| 6 | TAX18% | 1 | TaX | 68,076.97 | ₹68,076.97 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2138487.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .