| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.7 LAdmitted-Finance NACHIPUDUR NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | L1 | Admitted-Finance | |
| 2 | L2₹98.7 L+₹8,561 (0.09%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
9 Jun 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Director/ Project Director
DRDA, SALEM
PACKAGE NO. 02/2019-20 - YERCAUD BLOCK- NO. OF WORKS 01 - IN SALEM DISTRICT - SCPAR - 2019-20
2020_RDTN_166422_2
Roc.No.354/2020/A5
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As per tender schedule
3 documents required · 3 mandatory
₹0
₹1 L
DRDA, SALEM
22 Jun 2020
3 Jun 2020
9 Jun 2020
3 Jun 2020
9 Jun 2020
3 Jun 2020
5 Jun 2020
90 days
Amount
1.) Senthittu to Kalikadu road Km 0/0-0/885
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-0/885
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders and hard gravelly Soil as per SS 20A for Cutting
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Blasting to the Hard Rock Requiring Blasting & Stacking Hard Granite Surface for Hard Solid Measured inculding all Charges etc Complete..,
Medium rock and Medium Dense rock not Requiring Blasting inculding all Charges etc Complete..,
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction . Km 0/0-0/885
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method). Km 0/0-0/885
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.. Km 0/0-0/885
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-0/885
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., Km 0/0-0/885
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete . Km 0/0-0/885
Hectametre Stone
Sign Board
1.A) 1.50 m Span Culvert @ Ch 5 m
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing, laying, etc., complete
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete Below Sill Level
Above Sill Level
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification
Plain Cement concrete 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores etc.,complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section store etc, complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Provision for Bitumen Pad etc complete
Provision for Weep Holes Pipe etc complete
1.B) 1.50 m Span Culvert @ Ch 280 m
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing, laying, etc., complete
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete Below Sill Level
Above Sill Level
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification
Plain Cement concrete 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores etc.,complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section store etc, complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Provision for Bitumen Pad etc complete
Provision for Weep Holes Pipe etc complete
1.C) 1.50 m Span Culvert @ Ch 510 m
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing, laying, etc., complete
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete Below Sill Level
Above Sill Level
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification
Plain Cement concrete 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores etc.,complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section store etc, complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Provision for Bitumen Pad etc complete
Provision for Weep Holes Pipe etc complete
1.D) Protection Wall @ Km 0/0 - 1/0
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Random Rubble masonry in cement mortar 1:5. with simultaneous pointing using new stones from approved sources including cost and conveyance rough stones and bond stones including cost of cement which will be supplied departmentally at the departmental sec
Dry stone masonry for Retainingwall -10cum including cost and conveyanceof all materials and all labour charges etc complete for 10 cumDry stone masonry for Retainingwall -10cum including cost and conveyanceof all materials and all labour charges etc complete for 10 cum
Plastering with cement mortar 1:5 20 mm thick including cost and conveyance of all materials to site including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at departmental section stores and th
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Phoenix and Co
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .