Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Fee/PreQual/Technical/Finance | -9.99% | ₹8.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.2 L+₹92,175.52 (11.1%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹9.2 L+₹92,175.52 (11.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹9.2 L+₹92,175.52 (11.1%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹9.2 L+₹92,175.52 (11.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹9.2 L+₹92,175.52 (11.1%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹9.2 L+₹92,175.52 (11.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹9.2 L+₹92,175.52 (11.1%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹9.2 L+₹92,175.52 (11.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.2 L
EMD Value
₹9,230
Closing Date
27 Jul 2026, 5:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer, Rural Works Division-II, Jajpur at Jaraka
Aruha to Taranjia_Road_PMC, Seal Coat _2.000 to 3.000
2026_CERWI_136555_1
Tender Online JJPR-II-04 of 2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
Jaraka
2 documents required · 2 mandatory
₹4,000
₹9,230
Yes
31 Jul 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
20 Jul 2026 - 24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc complete and as per direction of Engineer-in-Charge. | 974.6 | sqm | 8.63 | ₹8,410.8 |
| 2 | Labour for scraping cleaning the road for laying built up spray grout in one layers 37.5 mm thick applying tack coat using 3 kg of bitumen , 0.45 cum of 25 mm to 40 mm size h.g metal and 12 kg of penetration grade bitumen for10 sqm.in each layer with 0.12 cum of 12 mm size h.g.chips as key stones spreading and laying including heating pouring bitumen metal and chips and rolling with PRR with all labour T & P etc. complete. as per direction of Engineer-in-Charge. AR-2006, P-152, SL-28 | 584 | sqm | 383.59 | ₹2,24,017.71 |
| 3 | Providing and applying Tack Coat with penetration grade of bitumen emulsion including all cost, carriage, royality, taxes of materials etc. complete as per direction of Engineer-in-Charge. (Mannually) | 1,661.25 | sqm | 43.06 | ₹71,533.43 |
| 4 | Providing and laying 20 mm thick Premix Carpet using 0.18 cum of 13.2 mm and 0.09 cum of 11.2 mm size chips with 14.60 kg. penetration grade of bitumen per 10 sqm including hand packing to proper camber and rolling with PRR including hire and running charges of PRR, tar boiler and other T&P articles including all cost, carriage, royality of chips and bitumen etc. (With H.M.plant) AR-147,SL-21 | 1,661.25 | sqm | 262.68 | ₹4,36,377.15 |
| 5 | Providing and laying 6 mm thick precoated Seal Coat Type - B using 0.06 cum of 6.7 mm size chips and down graded as per sieve analysis and 6.8 kg. of bitumen per 10 sqm including hire and running charges of PRR, bitumen mixture, tar boiler etc including all cost, carriage, royality of chips and bitumen etc.(With H.M.plant) | 1,661.25 | sqm | 109.76 | ₹1,82,338.8 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.17 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_602469.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .