| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.1 L+₹19,282 (1.76%)Admitted-Finance | ₹11.1 L+₹19,282 (1.76%) | L2 | Admitted-Finance |
| 3 | L3₹11.9 L+₹94,248 (8.62%)Admitted-Finance | ₹11.9 L+₹94,248 (8.62%) | L3 | Admitted-Finance |
| 4 | L4₹11.9 L+₹94,390 (8.63%)Admitted-Finance | ₹11.9 L+₹94,390 (8.63%) | L4 | Admitted-Finance |
| 5 | L5₹11.9 L+₹1.0 L (9.24%)Admitted-Finance | ₹11.9 L+₹1.0 L (9.24%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | The Trikuta Engineer L9 | V K ELECTRICAL CONTRACTOR L2 | JAMWAL ELECTRICALS L6 | NEW ALLIED TRADERS L1 | M/S NEW TRIKUTA TECHNOCRATES L8 | M/s delta generation L7 | M/s MAHASHAKTI ELECTRICAL WORKS L4 | M/S APR CONSTRUCTIONS L5 | M/S A G ELECTRICALS L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Augmentation of 11/0.433kV, 250 KVA to 400 KVA , 3-phase Distribution Substation at Swarn Vihar, Lane No 20 Bantalab (Scheme Code PDDSS2627100494) Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) | ||||||||||||
| 1.01 | 11/0.433 KV, 400KVA 3 Phase Distribution Transformer with Bi-mettalic Terminal Connectors Energy Level-2( Alluminum wound upto 200KVA, Copper wound for 250KVA or higher KVA ratings), and with LV Cable Box Having detachable Aluminium Gland plate. (Write back/ carriage of dismantled 250KVA Distribution transformer to divisional store.The bill will be considered only after the Write back Indent from Divisional Store.) | 1 | No | 11,75,000 ₹11,75,000 | 9,00,000 ₹9,00,000 | 9,10,000 ₹9,10,000 | 8,50,000 ₹8,50,000 Lowest | 11,00,000 ₹11,00,000 | 9,75,000 ₹9,75,000 | 8,57,000 ₹8,57,000 | 9,00,000 ₹9,00,000 | 9,00,000 ₹9,00,000 |
| 1.02 | 2x300 mm² Single Phase
Cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type | 44 | Mtr | 800 ₹35,200 | 400 ₹17,600 Lowest | 500 ₹22,000 | 620 ₹27,280 | 600 ₹26,400 | 800 ₹35,200 | 650 ₹28,600 | 450 ₹19,800 | 450 ₹19,800 |
| 1.03 | RCC Transformer foundation platform of size (1.27x1.27) mtr having height of 1.5 mtr above GL | 1 | No | 90,000 ₹90,000 | 55,000 ₹55,000 | 70,000 ₹70,000 | 40,000 ₹40,000 Lowest | 70,000 ₹70,000 | 70,000 ₹70,000 | 75,000 ₹75,000 | 60,000 ₹60,000 | 72,000 ₹72,000 |
| 1.04 | LT Distribution Box for 400 KvA DTR with MCCB for incomer and Switch Fuse Units for outgoing circuits.. | 1 | No | 95,000 ₹95,000 | 30,000 ₹30,000 Lowest | 75,000 ₹75,000 | 65,000 ₹65,000 | 1,10,000 ₹1,10,000 | 75,000 ₹75,000 | 57,000 ₹57,000 | 60,000 ₹60,000 | 54,000 ₹54,000 |
| 1.05 | Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No | 5,000 ₹15,000 | 1,500 ₹4,500 | 1,500 ₹4,500 | 2,000 ₹6,000 | 1,500 ₹4,500 | 1,000 ₹3,000 Lowest | 3,500 ₹10,500 | 2,500 ₹7,500 | 2,700 ₹8,100 |
| 1.06 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 15,000 ₹15,000 | 7,000 ₹7,000 Lowest | 11,000 ₹11,000 | 8,500 ₹8,500 | 9,000 ₹9,000 | 10,000 ₹10,000 | 9,000 ₹9,000 | 10,000 ₹10,000 | 9,000 ₹9,000 |
| 1.07 | 11KV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 8,000 ₹8,000 | 5,000 ₹5,000 | 5,500 ₹5,500 | 4,000 ₹4,000 Lowest | 4,500 ₹4,500 | 10,000 ₹10,000 | 7,000 ₹7,000 | 4,500 ₹4,500 | 9,000 ₹9,000 |
| 1.08 | Steel of Sorts | 100 | Kg | 200 ₹20,000 | 130 ₹13,000 | 145 ₹14,500 | 125 ₹12,500 Lowest | 140 ₹14,000 | 130 ₹13,000 | 140 ₹14,000 | 150 ₹15,000 | 144 ₹14,400 |
| 1.09 | Gapless Surge Arrestor, 9KV, 10KA, LA with Polymer housing stn. Type | 1 | Set | 8,000 ₹8,000 | 3,000 ₹3,000 Lowest | 7,000 ₹7,000 | 3,500 ₹3,500 | 4,000 ₹4,000 | 10,000 ₹10,000 | 8,000 ₹8,000 | 4,500 ₹4,500 | 9,000 ₹9,000 |
Tender Value
Refer Docs
EMD Value
₹37,000
Closing Date
7 Aug 2026, 2:00 pmClosed
Executive Engineer ED-III
Office of Executive Engineer ED-III
Augmentation of 250 KVA to 400 KVA Substation at Swarn Vihar Lane No 20 Bantalab along with laying of LT line on 50mm2 AB Cable on 8 Mtr PCC Pole within the jurisdiction of SD-II Janipur, Jammu on turnkey basis under UT Capex SCode PDDSS2627100494
2026_PDD_316727_1
ED-III/Jammu/27 of 2026-27
Open Tender
Electrical Works
Item Rate
30 days
Jurisdiction Of Electric SD Janipur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Executive Engineer ED-III
₹37,000
21 Aug 2026
18 Jul 2026
8 Aug 2026
18 Jul 2026
7 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Augmentation of 11/0.433kV, 250 KVA to 400 KVA , 3-phase Distribution Substation at Swarn Vihar, Lane No 20 Bantalab (Scheme Code PDDSS2627100494) Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) | |||||
| 1.01 | 11/0.433 KV, 400KVA 3 Phase Distribution Transformer with Bi-mettalic Terminal Connectors Energy Level-2( Alluminum wound upto 200KVA, Copper wound for 250KVA or higher KVA ratings), and with LV Cable Box Having detachable Aluminium Gland plate. (Write back/ carriage of dismantled 250KVA Distribution transformer to divisional store.The bill will be considered only after the Write back Indent from Divisional Store.) | 1 | No | - | - |
| 1.02 | 2x300 mm² Single Phase
Cable,1.1K V Grade, PVC Insulated Stranded Conductor FRLS type | 44 | Mtr | - | - |
| 1.03 | RCC Transformer foundation platform of size (1.27x1.27) mtr having height of 1.5 mtr above GL | 1 | No | - | - |
| 1.04 | LT Distribution Box for 400 KvA DTR with MCCB for incomer and Switch Fuse Units for outgoing circuits.. | 1 | No | - | - |
| 1.05 | Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 3 | No | - | - |
| 1.06 | 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | - | - |
| 1.07 | 11KV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | - | - |
| 1.08 | Steel of Sorts | 100 | Kg | - | - |
| 1.09 | Gapless Surge Arrestor, 9KV, 10KA, LA with Polymer housing stn. Type | 1 | Set | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.83 MB
Tendernotice_2.pdf
PDF • 1.86 MB
GTP.pdf
Tender Documents • 7.50 MB
RECDrawings.pdf
Tender Documents • 3.67 MB
BOQ_1034629.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .