Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹19.7 LAccepted-AOC BARABHORAY LOHANDIYA BAZAR GODDA JHARKHAND 814165 INDIA | GODDA | JHARKHAND | 814165 | ₹19.7 L Quoted ₹16.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹17.7 LRejected-Finance | ₹17.7 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹18.2 LRejected-Finance AT PO MAHAGAMA DIST GODDA JHARKHAND 814154 | MAHAGAMA | GODDA | JHARKHAND | 814154 | ₹18.2 L | L-3 | Rejected-Finance L-3 |
Tender Value
₹19.7 L
EMD Value
₹24,700
Closing Date
9 Feb 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of drain cum retaining wall near football ground at OB Dump rehab site under Rajmahal Area.
2026_ECL_352020_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/456 Dt-29.01.2026
Open Tender
Civil Works - Others
45 days
OB Dump rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹24,700
19 Apr 2026
29 Jan 2026
10 Feb 2026
29 Jan 2026
9 Feb 2026
29 Jan 2026
29 Jan 2026 - 2 Feb 2026
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and for all lift, as directed by Engineer-in-charge. All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_364811.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_364811.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid