Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | -22.00% | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.1 L+₹31,564.20 (8.33%)Admitted-Fee/PreQual/Technical/Finance | -15.50% | ₹4.1 L+₹31,564.20 (8.33%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.1 L+₹34,040.78 (8.99%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹4.1 L+₹34,040.78 (8.99%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹4.1 L+₹34,040.78 (8.99%)Admitted-Fee/PreQual/Technical/Finance DIVISION 179 UNIT 38 ZONE 13 | CHENNAI | CHENNAI | TAMIL NADU | -14.99% | ₹4.1 L+₹34,040.78 (8.99%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹4,900
Closing Date
7 Sept 2026, 3:00 pmClosed
ZONAL OFFICER
ZONE-X
Improvements to Amma Unavagam with renovation of Toilet Block in Division-140 office premises at Kodambakkam Road in Division-140, Unit-30, Zone-10.
2026_CoC_698457_1
Z.O.X.C.No.E1/KKM/9197/03/2026
Open Tender
Civil Works
Works
KODAMBAKKAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,900
7 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of Vertical Bored cast in situ RCC pi...eparately ) Grade of Concrete: M25 300 mm dia pile | 9 | R/M | 1,564.54 | ₹14,080.86 |
| 2 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 110 | KGS | 96.53 | ₹10,618.3 |
| 3 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAM | 5 | SQM | 1,178.29 | ₹5,891.45 |
| 4 | Cement Concrete 1:3:6 (One Cement, Three crushed s...least 1 metre height)-Mixing by mechanical means | 1 | CUM | 6,916.1 | ₹6,916.1 |
| 5 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 1 | CUM | 368.55 | ₹368.55 |
| 6 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 1 | CUM | 8,015.86 | ₹8,015.86 |
| 7 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:5 | 4 | CUM | 7,935.89 | ₹31,743.56 |
| 8 | Brick partition walls of 11.50cm thickness using b...rcement will be measured and paid for separately) | 8 | SQM | 1,072.61 | ₹8,580.88 |
| 9 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 52 | SQM | 317.59 | ₹16,514.68 |
| 10 | Painting New Plastered Wall Surface with Two finis...ed by the Executive Engineer before use on works.) | 80 | SQM | 201.05 | ₹16,084 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_839563.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .