Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance | ₹8.7 L | L1 | Accepted-Finance Lowest one |
| 2 | L2₹11.1 L+₹2.4 L (28.1%)Rejected-Finance HAMIRPUR ROAD NEAR BUS STAND UNA DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹11.1 L+₹2.4 L (28.1%) | L2 | Rejected-Finance Lowest second |
| 3 | L3₹11.5 L+₹2.8 L (32.6%)Rejected-Finance 127 3 LOWER BAZAR SHIMLA HP | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹11.5 L+₹2.8 L (32.6%) | L3 | Rejected-Finance Lowest Third |
Tender Value
₹9.4 L
EMD Value
₹18,900
Closing Date
2 Aug 2021, 11:00 amClosed
AGM WD
AGM WD SJPNL US CLUB SHIMLA PIN CODE 171001
LWSS Shimla Town SH Repair of Kirloskar make centrifugal pump set 550 Hp having Sr Number 12960060026 at Ashwani Khad
2021_MC_50202_1
4431 dated 22/07/2021
Open Tender
Miscellaneous Works
Item Rate
30 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
AGM WD SJPNL
₹18,900
18 Sept 2021
22 Jul 2021
2 Aug 2021
22 Jul 2021
2 Aug 2021
22 Jul 2021
22 Jul 2021 - 2 Aug 2021
Amount
Removal of pump from foundation and shifting to workshop for repair including loading and unloading at both side).
Dismentaling of complete pump after heating with gas complete all respect as per direction of Engineer-in-Charge.
P/F DE bearing NU-413, SKF make complete in all respect as per direction of Engineer-in-Charge.
P/F ND bearing NU-6314, SKF make complete in all respect as per direction of Engineer-in-Charge.
P/F ND bearing 29420, SKF make complete in all respect as per direction of Engineer-in-Charge.
P/F impeller complete in all respcet as per the direction of Engineer-in-Charge.
P/F shaft of SS 410 material complete in all respect as per the direction of Engineer-in-Charge.
Reapir of defushers complete in all respect as per the direction of Engineer-in-Charge.
P/F neckring complete in all respect as per the direction of Engineer-in-Charge.
P/F guide bushes complete in all respect
P/F gland sleeves complte in all respect as per the direction of engineer in charge.
P/F of o Rings complte in all respect as per the direction of Engineer-in-Charge.
P/F coupling complete in all respect
SS ENGINEERING WORKS
National Electrical Traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .