| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹1.8 L Quoted ₹1.6 L | 1 | Accepted-AOC L1 |
| 2 | 2₹1.7 LRejected-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹1.7 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L1 | PREETHI ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for the existing half round S.S. wire mesh with the frame structure of two halves of condenser ball catcher assembly provided over the Flow Control Valve in Cooling Tower and dismantling and place the C.B. catcher assembly on the fan floor to facilitate for O/H of Flow Control Valve and reassembly the condenser ball catcher assembly over the FCV. | 10 | Nos | 2,160 ₹21,600 | 2,500 ₹25,000 |
| 2.00 | Charges for dismantling of existing deteriorated 500 mm dia Disc type angular valve assembly from respective hot water pipe nozzle, cleaning the pipe nozzle flange surface, lifting, positioning, and reassembling the valve. | 10 | Nos | 7,900 ₹79,000 | 8,100 ₹81,000 |
| 3.00 | Charges for dismantling, cleaning & examining of valve internal components and renewal of other worn out components such as spindle support with bush / disc support M.S. bush by cutting, removing and welding with new M.S. bush, removing the existing damaged & worn out rubber seal of the disc, cleaning and fixing the new rubber seal over the disc by using proper adhesives if necessary, and reassembling and re-commissioning of the valves in the hot water pipe lines of Cooling Tower III. | 10 | Nos | 4,700 ₹47,000 | 5,000 ₹50,000 |
| 4.00 | Cost of Neoprene Rubber(Black) Gasket,Size 1 M X 2 M X 5 MM thick for Sl.No.2 | 20 | Kgs | 100 ₹2,000 | 120 ₹2,400 |
| 5.00 | Cost of Cutting Gas for Sl.No. 3 | 0.5 | Set | 4,500 ₹2,250 | 5,000 ₹2,500 |
| 6.00 | Cost of Welding Electrode for Sl.No. 3 | 10 | Kgs | 500 ₹5,000 | 525 ₹5,250 |
| 7.00 | Consumable and T&P Cost for Sl.No.1 to 3 | 1 | No | 5,000 ₹5,000 | 6,000 ₹6,000 |
Tender Value
Refer Docs
EMD Value
₹1,700
Closing Date
28 Apr 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power
MTPS I CA CWS II Unit III Overhauling of Flow Control Valve complete assembly and renewal of its worn out components in Cooling Tower III
2025_EB_551564_1
SE / P and A / SE / M-I / MTPS-I / CA / OT. 14 / 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹1,700
Yes
26 May 2026
25 Apr 2025
29 Apr 2025
25 Apr 2025
28 Apr 2025
25 Apr 2025
Amount
Charges for the existing half round S.S. wire mesh with the frame structure of two halves of condenser ball catcher assembly provided over the Flow Control Valve in Cooling Tower and dismantling and place the C.B. catcher assembly on the fan floor to facilitate for O/H of Flow Control Valve and reassembly the condenser ball catcher assembly over the FCV.
Charges for dismantling of existing deteriorated 500 mm dia Disc type angular valve assembly from respective hot water pipe nozzle, cleaning the pipe nozzle flange surface, lifting, positioning, and reassembling the valve.
Charges for dismantling, cleaning & examining of valve internal components and renewal of other worn out components such as spindle support with bush / disc support M.S. bush by cutting, removing and welding with new M.S. bush, removing the existing damaged & worn out rubber seal of the disc, cleaning and fixing the new rubber seal over the disc by using proper adhesives if necessary, and reassembling and re-commissioning of the valves in the hot water pipe lines of Cooling Tower III.
Cost of Neoprene Rubber(Black) Gasket,Size 1 M X 2 M X 5 MM thick for Sl.No.2
Cost of Cutting Gas for Sl.No. 3
Cost of Welding Electrode for Sl.No. 3
Consumable and T&P Cost for Sl.No.1 to 3
PREETHI ENTERPRISES (BID ID -1320579)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx