| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAccepted-AOC NO 15B 17C PANAGAL 2ND ST MATHICHIYAM MADURAI 20 | MADURAI | MADURAI | TAMIL NADU | 20 | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹48.9 L+₹1.9 L (4.01%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹49.3 L+₹2.3 L (4.82%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹50.0 L+₹2.9 L (6.25%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹48,000
Closing Date
18 Feb 2025, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Construction Transformer Plinth Cable duct new yard enhancement Labour charges Supply at Senguruchi
2025_EB_522547_1
SE/GCC/MDU F.Specn.No.026/2024-25
Open Tender
Civil Works - Others
Works
180 days
Senguruchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹48,000
14 Mar 2025
3 Feb 2025
19 Feb 2025
4 Feb 2025
18 Feb 2025
4 Feb 2025
Amount
Jungle clearance, Removal of weeds, vegetation in the yard area and seiving the existing blue metal
Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m.
Supplying and filling of river sand in SS area for fire prvention materials as per standard specification including cost of all materials lead lift etc complete.
PCC 1:3:6 mix using 20mm HBG machine crushed metal for 110 KV Gantry Strung bus, support pole, AB switch, LAS, Structure pole, Yard light pole, Concreting works without fom work including cost of all labour materials lead lift curing etc complete.
RCC 1:1.5:3 mix using 20 mm HBG machine crushed metal for formation of Road concrete with fom work over that PCC 1:3:6 top neatly finishing with suitable camber including cost of all labour materials lead lift curing etc complete. Excluding cost of reinfocement-New yard road
PCC 1:4:8 using 40 mm metal for foundation including cost of all labour materials lead lift curing etc complete.
RCC 1:1.5:3 using 20 mm metal for RAFT foundation without form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.
PCC 1:2:4 using 20 mm metal for foundation without form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete
PCC 1:2:4 using 20 mm metal for foundation with form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete
RCC 1:1.5:3 column footing without formwork using 12-20mm graded hard machine broken granite stone, including cost of all materials,curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.
RCC 1:1.5:3 using 20 mm metal for foundation with form work including cost of all materials,curing, all labour charges, lead, lift, etc. complete.-Transformer Plinth
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete.
RCC 1:5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Grade beam concrete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Beamconcrete.
BW in CM 1:5 using II Class chamber bricks including cost of all materials,curing, all labour charges, lead, lift, etc. complete.
Plastering CM 1:3 12mm thick including cost of all materials,curing, all labour charges, lead, lift, etc. complete.
RCC 1:1.5:3 using 20 mm metal for precast slab including cost of all materials,curing, all labour charges, lead, lift, etc. complete.
MS / RTS Reinforcement for RCC works including cost of binding wire including cost of all materials, labour charges, lead, lift, etc complete
Supplying and fabrication and fixing of M.S Angle including painting etc. including cost of all materials, labour charges, lead, lift, etc complet. for Cable duct
Colour Washing Two coats with exterior emulsion paint over one coat of emulsion primer.
Supplying and filling of 20 mm metal in the yard including cost of all materials, labour charges, lead, lift, etc complet.
Supply ,transport and fixing of 90 LBS fixing for Transformer plinth top including cost of all materials, labour charges, lead, lift, etc complete.
Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS:1838 including cost of primer,sealing compound in expansion joints in cocrete road , including cost of mateterials, labour, lead,lift finishing etc., Complete.
Supply and delivery of 160 mm dia PVC 6 Kg /cm2 Casing pipe as per ISI Standard Specifications and as directed by TNEB Engineers at Site.
Supplying and filling of Gravel in yard and SS area including transport, loading, unloading, stacking to departmental gauge for premearsurement , spreading ,watering, consolidation ,labour,lead,lift, etc., copmplete.
Supplying and placing of 60 cm inner dia, 30 cm height and 5cm thick earth trough in two piece with top cover including necessary earth work excavation including cost of labour, lead ,lift, etc., complete.
Supply Portion 33 KV UG Cable: Supply of OD Termination Kit (Outdoor - HS type) for 33 KV 1 x 630 Sq.mm cable
Erection and Laying of 33 KV UG Cable: Earth work excavation Normal Clay / Hard gravel soil to a depth of 1.2 m wide 1 m of earth / trench for earthmat, UG cable etc., of any size / depth narrow excavation as directed by the field engineer.
Labour charges for laying of single run 1 x 630 / 3 x 300 Sq.mm 33 KV / 11 KV XLPE cable in cable duct including unloading from department lorry, cutting wherever necessary, minor transporting, laying, binding, clamping (Outdoor termination at both ends), Placing the V-through above the UG cable neatly, Spreading the M-Sand below the UG cable etc., complete as directed by field engineer.
Refilling with filling sand in layers well consodlidated as per standared specification including cost of all materials, labour, lead, lift etc., complete.
Transporting and clearing the excess excavated earth and debris then and there immediately to avoid any hindrance to the normal flow of traffic and Public beyond a distance of 5 Km from the work spot as per direction of engineer in charge including loading and unloading etc., complete.
Casting and placing of RCC off set slab (Cable route indication slab) of size 750*750*60mm casting in RCC 1:2:4 using 12 to 20 HBG metal with necessary reinforcement, pilling, shuttering, curing, transport from casting yard to various locations and fixing the slab along 33 KV cable route as directed by site engineer at site with PCC 1:3:6 including cost of all materials, labour, lead, lift etc., including 2 coats of flourescent painting (TANTRANSCO rate)
Cost of M-Sand including transport, lead, lift etc., as directed by field engineer.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
HARISH CONSTRUCTION (BID ID -1251429)
YAMINEE ELECTRICAL PROJECTS PRIVATE LIMITED (BID ID -1252429)
K.SARAVANAKUMAR (BID ID -1251591)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .