| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC 135 GROUND FLOOR DAWADIPAR BAJAR BHANDARA ROAD BHANDARA BHANDARA MAHARASHTRA 441924 | BHANDARA | MAHARASHTRA | 441924 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹10.6 L+₹169.94 (0.02%)Rejected-AOC | L2 | Rejected-AOC NOT L1 | |
| 3 | L3₹11.1 L+₹47,073.93 (4.43%)Rejected-Finance A 201 MAHINDRA MAHINDRA CSH LTD BEHIND BMC SCHOOL DUTTAPADA ROAD BORIVALI E | L3 | Rejected-Finance NOT L1 | |
| 4 | L4₹11.4 L+₹82,931.69 (7.81%)Rejected-Finance 001 RAJ VAIBHAV CHS CTS NO 654 PARANJAPE B SCHEME ROAD NO 1 VILE PARLE E MUMBAI 400 057 | MUMBAI SUBURBAN | MAHARASHTRA | 400057 | L4 | Rejected-Finance NOT L1 | |
| 5 | L5₹11.7 L+₹1.1 L (10.2%)Rejected-Finance 204 BLDG NO 3 CHAITANYA CHSL S V ROAD SIDDHARTH NAGAR GOREGAON W MUMBAI 400 104 | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L5 | Rejected-Finance NOT L1 |
Tender Value
₹17.0 L
EMD Value
₹17,000
Closing Date
14 Oct 2021, 5:45 pmClosed
Executive Engineer (West) Division, Mumbai Slum Im
Executive Engineer (West) Division, Mumbai Slum Improvement Board, (Unit of MHADA), Room no. 537, 4th floor, Griha Nirman Bhavan, Bandra (East), Mumbai 400 051,
Const. of Passage / Nalla at Hanuman Rahiwashi Sangh (Corporattor fund)
2021_MHADA_723444_4
EE/West/etender/54/2021-22
Open Tender
Civil Works
Percentage
365 days
Hanuman Rahiwashi Sangh
Please refer Tender Document
2 documents required · 2 mandatory
₹560
₹17,000
15 Feb 2022
30 Sept 2021
18 Oct 2021
30 Sept 2021
14 Oct 2021
30 Sept 2021
eProcurement System Government of Maharashtra Created By: Rakesh Dhanwate Created Date/Time: 23-Nov-2021 06:33 PM Tender Title: Const. of Passage / Nalla at Hanuman Rahiwashi Sangh (Corporattor fund) Tender ID: 2021_MHADA_723444_4
Tender Inviting Authority: Executive Engineer (west),Mumbai Slum Improvement Board
Name of Work : Const. of Passage / Nalla at Hanuman Rahiwashi Sangh (Corporattor fund)
Contract No: EE/West/MSIB /e-Tender / 54 / 2021-22
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 manshienterprises(GSTN-27APCPC7289Q1Z6) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
2.00 Girja Construction co(GSTN-27APMPC8137R1Z5) 1699420.00 -27.27 1235988.17 Tweleve Lakh Thirty Five Thousand Nine Hundred and Eighty Eight
3.00 M/s Rionna Enterprises(GSTN-27AAXPH6213KIZ9) 1699420.00 -32.63 1144899.25 Eleven Lakh Fourty Four Thousand Eight Hundred and Ninty Nine
4.00 ARHAAN ENTERPRISE(GSTN-27ARPPS4879R1Z9) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
5.00 M/s. Lalu Construction(GSTN-27AABFL6177G1Z6) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
6.00 Aarya Enterprises(GSTN-27AAFPC3232RIZL) 1699420.00 2.00 1733408.40 Seventeen Lakh Thirty Three Thousand Four Hundred and Eight
7.00 M/s.Sudhir Babu Dhotre(GSTN-27ARNPD8959R1ZL) 1699420.00 -9.00 1546472.20 Fifteen Lakh Fourty Six Thousand Four Hundred and Seventy Two
8.00 Tarak Enterprises(GSTN-27BQPPS0063R1ZY) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
9.00 NR Infratech(GSTN-27AJVPV1402B1Z8) 1699420.00 -34.74 1109041.49 Eleven Lakh Nine Thousand Fourty One
10.00 Patel Trading Co(GSTN-27AAJFP1515F1ZF) 1699420.00 -37.51 1061967.56 Ten Lakh Sixty One Thousand Nine Hundred and Sixty Seven
11.00 KAP ENTERPRISES(GSTN-27BKHPS8086A1ZU) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
12.00 ND INFRA PROJECTS(GSTN-27AAMFN9916A1Z4) 1699420.00 -28.10 1221882.98 Tweleve Lakh Twenty One Thousand Eight Hundred and Eighty Two
13.00 M/s. Kamna Construction(GSTN-27AAVPC5384JIZ4) 1699420.00 -13.50 1469998.30 Fourteen Lakh Sixty Nine Thousand Nine Hundred and Ninty Eight
14.00 M/s Maval Construction(GSTN-27AGPPC3202PIZ9) 1699420.00 -.09 1697890.52 Sixteen Lakh Ninty Seven Thousand Eight Hundred and Ninty
15.00 Anurag Enterprises(GSTN-27AARPY1780C1Z9) 1699420.00 -31.11 1170730.44 Eleven Lakh Seventy Thousand Seven Hundred and Thirty
16.00 SURYA ENTERPRISE(GSTN-27ABOFS9702J1ZI) 1699420.00 -5.00 1614449.00 Sixteen Lakh Fourteen Thousand Four Hundred and Fourty Nine
17.00 M/S SWASTIK CONSTRUCTION CO(GSTN-27AAVPM5632R1ZN) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
18.00 GLOBAL ENTERPRISES(GSTN-27AMIPM7560M3ZC) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
19.00 Murlidhar Enterprise(GSTN-27ALWPC9440R1Z3) 1699420.00 -25.50 1266067.90 Tweleve Lakh Sixty Six Thousand Sixty Seven
20.00 Mahadev Enterprise(GSTN-27DTZPS9001J1ZS) 1699420.00 -.16 1696700.93 Sixteen Lakh Ninty Six Thousand Seven Hundred
21.00 M/s. Prakalp Constructions(GSTN-27ADEPP8551A2ZL) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
22.00 shami enterprises(GSTN-27AFOPC2126E1ZU) 1699420.00 -25.85 1260119.93 Tweleve Lakh Sixty Thousand One Hundred and Ninteen
23.00 manjuladevelopers(GSTN-27BARPS5018J1Z4) 1699420.00 -15.30 1439408.74 Fourteen Lakh Thirty Nine Thousand Four Hundred and Eight
24.00 Pooja Enterprises(GSTN-NA) 1699420.00 -3.00 1648437.40 Sixteen Lakh Fourty Eight Thousand Four Hundred and Thirty Seven
25.00 V M Jain Construction(GSTN-NA) 1699420.00 -15.00 1444507.00 Fourteen Lakh Fourty Four Thousand Five Hundred and Seven
26.00 ROYAL CONSTRUCTION(GSTN-NA) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
27.00 B A Construction(GSTN-NA) 1699420.00 -24.10 1289859.78 Tweleve Lakh Eighty Nine Thousand Eight Hundred and Fifty Nine
28.00 Om Infratech(GSTN-NA) 1699420.00 -25.20 1271166.16 Tweleve Lakh Seventy One Thousand One Hundred and Sixty Six
29.00 RAHUL SHASHIKANT JOSHI(GSTN-NA) 1699420.00 -11.00 1512483.80 Fifteen Lakh Tweleve Thousand Four Hundred and Eighty Three
30.00 K. C. ENTERPRISES(GSTN-NA) 1699420.00 -37.50 1062137.50 Ten Lakh Sixty Two Thousand One Hundred and Thirty Seven
31.00 AARADHYA CONSTRUCTIONS(GSTN-NA) 1699420.00 -11.10 1510784.38 Fifteen Lakh Ten Thousand Seven Hundred and Eighty Four
32.00 D M Infratech(GSTN-NA) 1699420.00 -13.99 1461671.14 Fourteen Lakh Sixty One Thousand Six Hundred and Seventy One
33.00 m/s surya ujas construction(GSTN-NA) 1699420.00 0.00 1699420.00 Sixteen Lakh Ninty Nine Thousand Four Hundred and Twenty
Lowest Amount Quoted BY: Patel Trading Co(1061967.56)
BOQ Summary Details Tender Title: Const. of Passage / Nalla at Hanuman Rahiwashi Sangh (Corporattor fund) Tender ID: 2021_MHADA_723444_4
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Patel Trading Co 1061967.56 L1
2 K. C. ENTERPRISES 1062137.50 L2
3 NR Infratech 1109041.49 L3
4 M/s Rionna Enterprises 1144899.25 L4
5 Anurag Enterprises 1170730.44 L5
6 ND INFRA PROJECTS 1221882.98 L6
7 Girja Construction co 1235988.17 L7
8 shami enterprises 1260119.93 L8
9 Murlidhar Enterprise 1266067.90 L9
10 Om Infratech 1271166.16 L10
11 B A Construction 1289859.78 L11
12 manjuladevelopers 1439408.74 L12
13 V M Jain Construction 1444507.00 L13
14 D M Infratech 1461671.14 L14
15 M/s. Kamna Construction 1469998.30 L15
16 AARADHYA CONSTRUCTIONS 1510784.38 L16
17 RAHUL SHASHIKANT JOSHI 1512483.80 L17
18 M/s.Sudhir Babu Dhotre 1546472.20 L18
19 SURYA ENTERPRISE 1614449.00 L19
20 Pooja Enterprises 1648437.40 L20
21 Mahadev Enterprise 1696700.93 L21
22 M/s Maval Construction 1697890.52 L22
23 manshienterprises 1699420.00 L23
24 KAP ENTERPRISES 1699420.00 L23
25 M/S SWASTIK CONSTRUCTION CO 1699420.00 L23
26 GLOBAL ENTERPRISES 1699420.00 L23
27 ROYAL CONSTRUCTION 1699420.00 L23
28 Tarak Enterprises 1699420.00 L23
29 m/s surya ujas construction 1699420.00 L23
30 M/s. Prakalp Constructions 1699420.00 L23
31 M/s. Lalu Construction 1699420.00 L23
32 ARHAAN ENTERPRISE 1699420.00 L23
33 Aarya Enterprises 1733408.40 L24
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .