Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC GUDHALA VILL NANGLA DUDOLI PUNHANA 1225 8 2025R23859 | PUNHANA | NUH | HARYANA | 122508 | ₹24.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹31.1 L+₹7.0 L (29.1%)Rejected-AOC | ₹31.1 L+₹7.0 L (29.1%) | L2 | Rejected-AOC Reject |
| 3 | L3₹32.5 L+₹8.4 L (34.9%)Rejected-AOC | ₹32.5 L+₹8.4 L (34.9%) | L3 | Rejected-AOC Reject |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹28.3 L
EMD Value
₹56,540
Closing Date
15 Apr 2026, 5:00 pmClosed
Manish Sehrawat
Municipal Committee Punhana
Const. of Road and Drain from Rain Basera to Primery School,Sohrab to Jamil Bijaliwala and Behind Primery school to H/o Jakir W. No.12 MC Punhana
2026_HRY_513817_1
2026E2C380F0 FD99 4152 A9E2 7CA2FD264B7B340ULB
Open Tender
Civil Works
Works
190 days
MC Punhana
2 documents required · 2 mandatory
₹5,000
₹56,540
Yes
11 May 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
9 Apr 2026 - 15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | - | Sqm | 113 | - |
| 2 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | - | Kg. | 83 | - |
| 3 | [17.15.1]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material [Through Rate] | - | cum | 911 | - |
| 4 | [17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | - | cum | 1,038 | - |
| 5 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | - | Sqm | 7 | - |
| 6 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] | - | cum | 184 | - |
| 7 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | - | Sqm | 655 | - |
| 8 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | - | Sqm | 26 | - |
| 9 | [21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate] | - | Metre | 160 | - |
| 10 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | - | cum | 83 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_592640.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .