Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
3 Sept 2026, 5:00 pm
EXECUTIVE ENGR. (C ), BR-XIV
516, D. H. ROAD, KOLKATA-700034
MAINTENANCE OF U/G SEWER NEAR PR. NOS. 33, 92, M. I. D. ROAD IN WARD NO. 131.
2026_KMC_1039051_1
KMC/XIV/131/01/26-27/R
Open Tender
CIVIL WORKS
Percentage
30 days
WARD-131
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹6,000
21 Aug 2026
21 Aug 2026
5 Sept 2026
21 Aug 2026
3 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL
WORKS. III. EVENT MANAGEMENT : 2) Hire and labour charges for 100 mm dia bamboo railing on Jhau/Eucalyptus post 1.40 m above
G.L and 0.60 m below G.L tied strongly with bamboo railing with coir rope, digging holes for posts in any sort of soil or concrete surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer- in- charge after removing the barricade. (Cost of restoration to be paid separately). (a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah/Eucalyptus posts @ 1.80 m. apart. (i) Railing with 4 rows. ( 1st Corrigenda & addenda dated 08.01.2018) | 47 | METER | 97 | ₹4,559 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 1 | CUBIC METER PERCENT | 11,927 | ₹11,926.88 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring
shoring | 1 | CUBIC METER PERCENT | 19,238 | ₹19,236.08 |
| 4 | Hire and labour charges for 3.75cm. thick close timbering with planks, battens,runners,struts etc. complete removing them incl. penetration of shoring as per direction of the Engineer-in-Charge upto 1 M. trench width. (Vertical surface of contact area with supporting earth to be measured, payment for penetration will not be allowed) a) Depth upto
3.00 M below G.L. | - | SQUARE METER | 496 | - |
| 5 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | - | CUBIC METER PERCENT | 93,621 | - |
| 6 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc.
A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | - | SQUARE METER | 361 | - |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a)
1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) | - | CUBIC METER | 4,761 | - |
| 8 | SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL
PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(i) 300 mm | 18 | METER | 927 | ₹16,686 |
| 9 | COST OF SPIGOT / SOCKET TYPE OF PIPE WITH RUBBER
GASKET bore dia in mm 400 thickness in mm 75 standard length in
m. 2.5 | 1 | EACH | 4,604 | ₹4,604 |
| 10 | Laying of R.C.C. pipe with spigot ... socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe line). A)
Class NP-3 Pipe p) 400 mm dia | - | METER | 229 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
TForm.pdf
Tender Documents • 0.39 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
BOQ_2552086.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].