Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.7 L+₹48,499.32 (2.82%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.3 L+₹1.1 L (6.44%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹18.4 L+₹1.2 L (7.18%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | S M BUILDERS L2 | PRABHA INDUSTRY L4 | JAS Construction L1 | M.MAHENDRAN L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 45 | M3 | 160 ₹7,200 | 112.5 ₹5,062.5 | 104 ₹4,680 Lowest | 111.1 ₹4,999.5 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 9 | M3 | 5,200 ₹46,800 | 5,473.6 ₹49,262.4 | 5,145 ₹46,305 Lowest | 5,473.6 ₹49,262.4 |
| 3.00 | Supply and Fixing of RCC (1:1.5:3) post of size 125mm x 125mm at and 2100mm height-Vertical post including cost of all material charges and all labour charges | 404 | Nos | 600 ₹2,42,400 Lowest | 833.4 ₹3,36,693.6 | 779 ₹3,14,716 | 829.04 ₹3,34,932.16 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 37 | M3 | 6,200 ₹2,29,400 Lowest | 6,917.5 ₹2,55,947.5 | 6,502.5 ₹2,40,592.5 | 6,917.5 ₹2,55,947.5 |
| 5.00 | Providing fencing with GI barbed wire including cost of all labour but excluding the cost of material etc., complete as per standard specification. | 378 | Rmt | 400 ₹1,51,200 Lowest | 443.18 ₹1,67,522.04 | 416.5 ₹1,57,437 | 443.18 ₹1,67,522.04 |
| 6.00 | Supplying and fixing Chain Link Fencing 2"x2" using 10 Gauge Galvanised iron wire of all size including all cost and conveyance of all materials and all labour charges etc., Complete, and as directed by departmental officers. | 1,698 | M2 | 270 ₹4,58,460 | 246.8 ₹4,19,066.4 | 228.5 ₹3,87,993 Lowest | 243.36 ₹4,13,225.28 |
| 7.00 | Supplying and fixing Mild Steel grills for windows, ventilators etc., complete complying with standard specifications and as directed by the departmental officers. | 1,080 | Kg | 90 ₹97,200 Lowest | 109.5 ₹1,18,260 | 102 ₹1,10,160 | 108.9 ₹1,17,612 |
| 8.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 2,020 | Kg | 90 ₹1,81,800 | 94.1 ₹1,90,082 | 87.5 ₹1,76,750 Lowest | 92.97 ₹1,87,799.4 |
| 9.00 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with One coats of best approved first quality and colour of synthetic enamel paint over the priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 66 | M2 | 160 ₹10,560 | 97.15 ₹6,411.9 | 91.5 ₹6,039 Lowest | 97.15 ₹6,411.9 |
| 10.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by departmental officers. | 28 | M2 | 43 ₹1,204 | 39.75 ₹1,113 | 37.5 ₹1,050 Lowest | 39.75 ₹1,113 |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
21 Aug 2026, 3:00 pmClosed
Commissioner
Palakkad Main Road
Providing Fencing Arrangement to park at vellaiyan (Jrd luss villas),Maple Garden ,JRD Hill County ,Rajabrindhavan-1 Nagar,Rajabrindhavan Nagar-2 , Rajabrindhavan Nagar-3,rajive Gandhi Nagar -1,Rajive Gandhi Nagar-2 ,Jeyaselvi Nagar-1,Jeyaselvi Naga
2026_MAWS_691322_1
1307-5/2026/E1
Open Tender
Civil Works
Works
90 days
Madukkarai Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,000
15 Oct 2026
5 Aug 2026
21 Aug 2026
5 Aug 2026
21 Aug 2026
5 Aug 2026
5 Aug 2026 - 21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 45 | M3 | - | - |
| 2 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 9 | M3 | - | - |
| 3 | Supply and Fixing of RCC (1:1.5:3) post of size 125mm x 125mm at and 2100mm height-Vertical post including cost of all material charges and all labour charges | 404 | Nos | - | - |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 37 | M3 | - | - |
| 5 | Providing fencing with GI barbed wire including cost of all labour but excluding the cost of material etc., complete as per standard specification. | 378 | Rmt | - | - |
| 6 | Supplying and fixing Chain Link Fencing 2"x2" using 10 Gauge Galvanised iron wire of all size including all cost and conveyance of all materials and all labour charges etc., Complete, and as directed by departmental officers. | 1,698 | M2 | - | - |
| 7 | Supplying and fixing Mild Steel grills for windows, ventilators etc., complete complying with standard specifications and as directed by the departmental officers. | 1,080 | Kg | - | - |
| 8 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 2,020 | Kg | - | - |
| 9 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with One coats of best approved first quality and colour of synthetic enamel paint over the priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 66 | M2 | - | - |
| 10 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by departmental officers. | 28 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_831230.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_831230.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .