Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC 11 RUDRA WAREHOUSE KE PAAS GRAM SANV JILA REWA M P | REWA | REWA | MADHYA PRADESH | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | RUDRA CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00Interception & Diversion of Nallahs with STP works Project of Chandla town under SBM 2.0 | ||||
| 1.01 | 1. Survey, review and design of 2 Nos of Interception and diversion work.
2. Survey, Design and build 2 Nos Pumping station of 0.35 & 0.80 MLD and all appurtenant structures and allied works.
3. Providing, laying, jointing, testing, commissioning of Sewage pumping main of DI K-7 pipe having length of 2700 m of dia 100mm and 150 mm including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Design and build sewage treatment plant of installed capacity 0.75 MLD and all appurtenant structures and allied works.
5. Design and Construction of 100 m length Boundary wall.
6. Treated water pumping main of DI K-7 pipe having length of 403 m of dia 100 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
7. Providing, Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipment’s and fittings complete in all respect | 1 | Lum Sum | 2,86,07,626 ₹2,86,07,626 Lowest |
| 1.02Operation and Maintenance Cost next 10 Years | ||||
| 1.03 | 1st Year | 1 | Lum Sum | 16,00,000 ₹16,00,000 Lowest |
| 1.04 | 2nd Year | 1 | Lum Sum | 16,80,000 ₹16,80,000 Lowest |
| 1.05 | 3rd Year | 1 | Lum Sum | 17,64,000 ₹17,64,000 Lowest |
| 1.06 | 4th Year | 1 | Lum Sum | 18,52,200 ₹18,52,200 Lowest |
| 1.07 | 5th Year | 1 | Lum Sum | 19,55,810 ₹19,55,810 Lowest |
| 1.08 | 6th Year | 1 | Lum Sum | 20,42,051 ₹20,42,051 Lowest |
| 1.09 | 7th Year | 1 | Lum Sum | 21,44,154 ₹21,44,154 Lowest |
Tender Value
₹3.1 Cr
EMD Value
₹1.6 L
Closing Date
16 Feb 2026, 5:30 pmClosed
CMO NP Chandla
CMO NP Chandla
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR CHANDLA TOWN
2026_UAD_473747_1
NIT/11/DATE_06.01.2026
Open Tender
Civil Works - Others
Lump-sum
365 days
Chandla
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
₹1.6 L
Office of Nagar Parishad Chandla
24 Sept 2026
13 Jan 2026
17 Feb 2026
13 Jan 2026
16 Feb 2026
13 Jan 2026
21 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Interception & Diversion of Nallahs with STP works Project of Chandla town under SBM 2.0 | |||||
| 1.01 | 1. Survey, review and design of 2 Nos of Interception and diversion work.
2. Survey, Design and build 2 Nos Pumping station of 0.35 & 0.80 MLD and all appurtenant structures and allied works.
3. Providing, laying, jointing, testing, commissioning of Sewage pumping main of DI K-7 pipe having length of 2700 m of dia 100mm and 150 mm including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Design and build sewage treatment plant of installed capacity 0.75 MLD and all appurtenant structures and allied works.
5. Design and Construction of 100 m length Boundary wall.
6. Treated water pumping main of DI K-7 pipe having length of 403 m of dia 100 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
7. Providing, Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipment’s and fittings complete in all respect | 1 | Lum Sum | 3,12,72,000 | ₹3,12,72,000 |
| 1.02 | Operation and Maintenance Cost next 10 Years | - | - | - | - |
| 1.03 | 1st Year | 1 | Lum Sum | 26,77,000 | ₹26,77,000 |
| 1.04 | 2nd Year | 1 | Lum Sum | 28,37,620 | ₹28,37,620 |
| 1.05 | 3rd Year | 1 | Lum Sum | 30,07,877.2 | ₹30,07,877.2 |
| 1.06 | 4th Year | 1 | Lum Sum | 31,88,349.83 | ₹31,88,349.83 |
| 1.07 | 5th Year | 1 | Lum Sum | 33,79,650.82 | ₹33,79,650.82 |
| 1.08 | 6th Year | 1 | Lum Sum | 35,82,429.87 | ₹35,82,429.87 |
| 1.09 | 7th Year | 1 | Lum Sum | 37,97,375.66 | ₹37,97,375.66 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TenderDocument.pdf
Tender Documents • 2.16 MB
WorkDetail.pdf
Other Document • 2.26 MB
BOQ_558600.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .