Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.6 LAdmitted-Finance | ₹44.6 L | L1 | Admitted-Finance |
| 2 | L2₹45.5 L+₹90,837.46 (2.04%)Admitted-Finance | ₹45.5 L+₹90,837.46 (2.04%) | L2 | Admitted-Finance |
| 3 | L3₹46.0 L+₹1.4 L (3.17%)Admitted-Finance | ₹46.0 L+₹1.4 L (3.17%) | L3 | Admitted-Finance |
| 4 | L4₹46.7 L+₹2.1 L (4.63%)Admitted-Finance | ₹46.7 L+₹2.1 L (4.63%) | L4 | Admitted-Finance |
| 5 | L5₹47.9 L+₹3.3 L (7.39%)Admitted-Finance | ₹47.9 L+₹3.3 L (7.39%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BROKPA CONSTRUCTION L2 | M/S PD ENTERPRISES L5 | M/S PASSANG CONSTRUCTION L3 | M/S ROLTSO ENTERPRISES L7 | M/S TP ENTERPRISE L6 | M/S NT ENTERPRISES L4 | M/S T LAMU ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in hard/dense soil, complete all as specified and directed. | 48 | Sqm | 160 ₹7,680 | 180 ₹8,640 | 150 ₹7,200 | 200 ₹9,600 | 210 ₹10,080 | 170 ₹8,160 | 140 ₹6,720 Lowest |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and directed. | 7 | Cum | 980 ₹6,860 | 1,000 ₹7,000 | 970 ₹6,790 | 1,020 ₹7,140 | 1,030 ₹7,210 | 990 ₹6,930 | 960 ₹6,720 Lowest |
| 3.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. | 3.8 | Cum | 230 ₹874 | 250 ₹950 | 220 ₹836 | 270 ₹1,026 | 280 ₹1,064 | 240 ₹912 | 210 ₹798 Lowest |
| 4.00 | Excavating in post holes each n exc 0.5 cum getting out, returning filling in and ramming earth or broken rubble mixed with earth around, in layers not exceedings 25cm watering and removing surplus soil to distance n exc 50 m and making good surface in hard/dense soils complete all as specified and directed. | 20 | Each | 580 ₹11,600 | 600 ₹12,000 | 590 ₹11,800 | 620 ₹12,400 | 630 ₹12,600 | 590 ₹11,800 | 570 ₹11,400 Lowest |
| 5.00 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point, complete all as specified and directed. | 10.32 | Cum | 580 ₹5,985.6 | 600 ₹6,192 | 590 ₹6,088.8 | 630 ₹6,501.6 | 650 ₹6,708 | 590 ₹6,088.8 | 570 ₹5,882.4 Lowest |
| 6.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exc 15cm thickness (below or above ground level) complete all as specified and directed by Engr-in-Charge. | 1.8 | Cum | 2,060 ₹3,708 | 2,080 ₹3,744 | 2,060 ₹3,708 | 2,100 ₹3,780 | 2,120 ₹3,816 | 2,070 ₹3,726 | 2,050 ₹3,690 Lowest |
| 7.00 | Dismantling timber scantling 40 sqcm and over in section in any position framed work, complete all as specified and directed by Engr-in-Charge. | 1.9 | Cum | 2,010 ₹3,815.86 | 2,030 ₹3,853.83 | 2,020 ₹3,834.84 | 2,070 ₹3,929.77 | 2,080 ₹3,948.75 | 2,020 ₹3,834.84 | 2,000 ₹3,796.88 Lowest |
| 8.00 | Dismantling unframed work in fillets, rails, posts, rafters, purlins etc under 40sqcm in section, complete all as specified and directed by Engr-in-Charge. | 117.5 | RM | 50 ₹5,875 | 80 ₹9,400 | 50 ₹5,875 | 150 ₹17,625 | 160 ₹18,800 | 60 ₹7,050 | 40 ₹4,700 Lowest |
| 9.00 | Dismantling boarding any description, fixed with any position with nails, complete all as specified and directed by Engr-in-Charge. | 132.7 | Sqm | 70 ₹9,289 | 100 ₹13,270 | 80 ₹10,616 | 120 ₹15,924 | 130 ₹17,251 | 90 ₹11,943 | 60 ₹7,962 Lowest |
| 10.00 | Dismantling Plain or corrugated steel sheeting, any gauge, thickness including nanital pattern or similar pattern roof covering, complete all as specified and directed by Engr-in-Charge. | 181 | Sqm | 55 ₹9,955 | 75 ₹13,575 | 65 ₹11,765 | 90 ₹16,290 | 100 ₹18,100 | 65 ₹11,765 | 45 ₹8,145 Lowest |
Tender Value
₹43.9 L
EMD Value
₹88,000
Closing Date
22 Jun 2026, 6:00 pmClosed
Maj Rohit Gogoi
GE 859 EWS
PROVN OF SPL REPAIR AND PROVN OF VARIOUS REV WORK AND MINOR WORK AT BAISHAKI MIL STN UNDER GE 859 EWS TAWANG
2026_MES_766309_1
9022/E8
Open Tender
Civil Works
Item Rate
180 days
BAISAKHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE 859 EWS
₹88,000
Yes
25 Jun 2026
25 May 2026
23 Jun 2026
25 May 2026
22 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in hard/dense soil, complete all as specified and directed. | 48 | Sqm | - | - |
| 2 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and directed. | 7 | Cum | - | - |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. | 3.8 | Cum | - | - |
| 4 | Excavating in post holes each n exc 0.5 cum getting out, returning filling in and ramming earth or broken rubble mixed with earth around, in layers not exceedings 25cm watering and removing surplus soil to distance n exc 50 m and making good surface in hard/dense soils complete all as specified and directed. | 20 | Each | - | - |
| 5 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point, complete all as specified and directed. | 10.32 | Cum | - | - |
| 6 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exc 15cm thickness (below or above ground level) complete all as specified and directed by Engr-in-Charge. | 1.8 | Cum | - | - |
| 7 | Dismantling timber scantling 40 sqcm and over in section in any position framed work, complete all as specified and directed by Engr-in-Charge. | 1.9 | Cum | - | - |
| 8 | Dismantling unframed work in fillets, rails, posts, rafters, purlins etc under 40sqcm in section, complete all as specified and directed by Engr-in-Charge. | 117.5 | RM | - | - |
| 9 | Dismantling boarding any description, fixed with any position with nails, complete all as specified and directed by Engr-in-Charge. | 132.7 | Sqm | - | - |
| 10 | Dismantling Plain or corrugated steel sheeting, any gauge, thickness including nanital pattern or similar pattern roof covering, complete all as specified and directed by Engr-in-Charge. | 181 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_858228.xls
BOQ • 0.32 MB
Tenderdocus.pdf
Tender Documents • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .