Tender Value
₹84.2 Cr
EMD Value
₹1.7 Cr
Closing Date
24 Sept 2026, 2:30 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
Yes
11/09/2026 14:30
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
GATISHAKTI
30 conditions · 2 needing a document upload
The tenderer must have a minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case the balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure specified in Tender Document, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Standard technical criteria are as follows:
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:
Three similar works, each costing not less than the amount equal to 30% of advertised value of the tender, Or
Two similar works, each costing not less than the amount equal to 40% of advertised value of the tender, Or
One similar work costing not less than the amount equal to 60% of advertised value of the tender.
In case of composite works, tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:
Three similar works, each costing not less than the amount equal to 30% of advertised value of each component of tender, Or
Two similar works, each costing not less than the amount equal to 40% of advertised value of each component of tender, Or
One similar work costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for (1.2): Separate completed works of minimum required values 1.2.4 shall also be considered for fulfillment of technical eligibility criteria for different components.
Note: (a)The 'work' includes subletted works also, if awarded to subleting contractor with the approval of main client. The work experience certificate of subletted work should be issued by the main client only, to be eligible for consideration. To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised,legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. (b)Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been 1.3.1 made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender.
In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials.
If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials.
In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the 1.5.1 completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work.
If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 1.2.4 & 1.3, the same shall be considered for the purpose of fulfillment of credentials
In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility.
Defination of Similar Work :- Any Building works with framed structure.
69 conditions · 12 needing a document upload
" No post tender correspondence will be done with the participant tenderer(s) for deficient credentials noted during scrutiny of tender/offer nor any credential will be accepted after opening of the tender and the offer shall be decided on the basis of submitted/Credentials downloaded with offer only"
If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender.
After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society/HUF etc. shall be neither asked nor considered, if submitted.Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in tender offer submitted
The tenderer/s shall submit a duly filled Tender form as per "ANNEXURE-I" OF STANDARD TENDER DOCUMENT"
BID Security (Bank Guarantee Bond from)-Annexure-VIA, The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of Bid).
The following documents should be specified for submission along with tender:
A. List of Personnel, Organization available on hand and proposed to be engaged for the subject work.
B. List of plant Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work.
C. The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, Date of actual start, actual completion and final value of contract should also be given.
D. List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
The tenderers whether sole proprietor , a limited company or a partnership firm he/they should submit authentic proof in terms of partnership deed, proprietorship documents etc. along with the tender. If he/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by Notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorizing him/her name to submit the tender, sign the agreement , receive money, witness measurements, sign measurement books , compromise, settie, relinquish any claims, preferred by firm and also sign No Claim Certificate and refer all or any disputes arbitration.
Bid Security: (a)Subject to exemptions provided under para 4(iv)) of this document, the tender must be accompanied by a Bid Security as mentioned in tender documents, failing which the tender shall be summarily rejected. (b)The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender. It is understood that the tender documents have been issued to the Tenderer(s) and the Tenderer(s), is / are permitted to tender in consideration of the stipulation on his / their part that after submitting his / Their tender subject to the period being extended further, if required by mutual agreement from time to time, he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to North East Frontier Railway. Should the tenderer fail to observe or comply with the foregoing stipulation, the amount deposited or Bank guarantee bond submitted as Bid Security for the due performance of the above stipulation, shall be forfeited to the Railway. (c)If his tender is accepted, (i)the Bid Security mentioned in sub para(a) above deposited in cash through e- payment gateway will be retained as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract; (ii)the Bid Security mentioned in sub para(a) above submitted as Bank guarantee bond, will be encashed as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract. The Bid Security of other Tenderers shall, save as herein before provided, be returned to them, but the Railway shall not be responsible for any loss or depreciation to the Bid Security that may happen thereto while in their possession, nor be liable to pay interest thereon. (d)In case Contractor submits the Term Deposit Receipt/Bank Guarantee Bond towards either the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security so retained as per sub para(c) above, to the Contractor.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please provide your bank details to facilitate payment through ECS.
Request for Proposal (RFP) for providing Project General Management Services for providing "Comprehensive Consultancy services from the stage of Feasibility Study & DPR preparation for elimination of Level Crossing gates in NF Railway by constructing ROB and/ RUB/LHS/Other Structures/ Road Diversion as required including Detailed Design of required components of finalised scheme, Tendering for execution of works as per finalized scheme, Techno-Managerial Consultancy, Processing & Facilitation for land acquisition, Project supervision Services/Project Management Consultancy etc. for execution of work till closure of level crossings/Defect Liability Period of execution contract".
CPM-GS-MLG-PC-2026-07~NFR
CPM-GS-MLG-PC-2026-07
Open
Works - General
60 Months
Kamrup, Assam
₹0
₹1.7 Cr
3 Sept 2026
3 Sept 2026
10 Sept 2026
11 Sept 2026
130 items across 16 schedules · ₹84,21,83,397.91 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Preparation of GAD, Detailed design for foundation, sub-structure of viaduct span of ROB and approach spans, Design of Reinforced Earth Retaining wall etc as provided in scope of work as per relevant IR, BIS, IRC and other codes for the option of ROB alignment/span selected by Employer: This item includes:(i) Integrated Key plan of entire ROB alignment covering Railway portion, take off and landing approaches, arrangements of ROB a p p r o a c h e s withNHAI/other Road authorities will be developed and included in GAD as per the Technical Requirement mentioned in the SCC. (ii) Preparation of GADs as per check list of NFR and Codal provision. (iii) Preparation of Preliminary and detailed design of foundation, substructure, superstructure ( Compactable with RDSO standard drawings) including staircase, approach slab (wherever applicable) & Good for construction drawings (GFC Drawings) and all other drawing as required for construction of Railway portion of the ROB and both approaches.(iv) Submission of proof checked detailed design and Good for construction drawings (DFC drawings) for foundation, substructure, superstructure (in non-RDSO span is adopted) reinforced earth wall and retaining wall.(v) The detailed design of superstructure will be further govern as per para (iv) of deliverable in part-i part-1 chapter-III. (vi) Preparation of bill of quantity (BOQ), detailed estimate, technical specifications and tender document as per preliminary design and drawings. (vii) Checking of design/drawing submitted by contractor for bearing, launching scheme, temporary arrangement drawing etc. if required. (viii) Technical support for getting approval from Railway/CRS including approval of temporary stagging and launching scheme if required. (ix) Designer support during construction of ROB including site visit as per requirement of Railways. This will include modification design/drawings as and when required. (x) Out station, visit with stake holder attached by consultant team on specific advice of Railways and nothing extra will be paid for visits for such meeting during currency of contract. (xi) Proof checking of designs from IIT/NIT and Government Universities with approval of institute by Railways.Note:- In case consultant is not required to prepared GAD for anyROB,RUB deduction @ Rs.15,000/- per ROB/RUB shall be made. Ifsub-item (vi) regarding BOQ, tender d o c u m e n t is not operatedfurther deduction @Rs.20,000/- per ROB will be made | Each | 59.00 | 7,37,330 | 4,35,02,470 |
| 2 | Submission of comprehensive soil investigation report confirming to relevant IS codes and specifications in proper format and in A4 size paper complete and direction of the Engineer or his Authorized representative. | Set | 59.00 | 20,000 | 11,80,000 |
| 3 | C o n d u c t i n g final location survey for construction of ROBs as per relevant para of IR Engineering Code(1993) edition and s u b m i s s i o n of report. Work to be conducted as per Railways latest codes and as per terms of reference mentioned in the tender document.Note:- The Rate should include the following items. (i) Conducting detailed survey for taking longitudinal and transverse section taking detail of waterways, electrical and telephone crossing road details etc. long the route and plotting the alignment on village map, village map to be arranged by contractor . (ii) Pegging out of alignment at every 20m interval on straight and 10m interval on curves including setting out of curves with transition etc. working out details quantities of all items of earthwork, concrete, steel, bituminous Road items (As per Railway Norms), and submission of d o c u m e n t as per relevant Paras of Engineering code with schematic diagram. (iii) Planting of concrete pillars of size 30cm x 30cm x 60cm of 1:2:4 cement concrete proportion at every 50m interval/at suitable location (with contractor's materials labour tools and plants including taxes and royalties) (iv) Submission of detailed project report in 5(five) copies and soft copy on CD. (v) Transferring the finalised alignment on ground using total station or any other survey instrument as approved by Engineer-in- charge. (vi) Preparation of Land plans table along the existing track and proposed alignment for identification & measurement of adjoining properties required for superimposition of revenue record. It also includes collection of revenue maps. (vii) Schedule of land property required for (Railway portion + approaches) for acquisition purpose will be prepared by the consultant as per format advised by NF Railway. (viii) Preparation of land acquisition proposal in five copies as per Revenue Department requirements of respective State including collection of Land Records including superimposition of revenue record on proposed alignment & calculation of land requirement. (ix) Preparation Acquisition (LA proposal for publication after JMS with State Government officials. (x) Preparation of Form 1 for LA with consultation of respective state government officials | Each | 59.00 | 2,39,956 | 1,41,57,404 |
| 4 | Manufacturing, supplying and fixing of concrete/RCC (1:2:4) pillars of different size at every 250m interval along the centre line of the alignment and at approaches of major bridges for Bench Marks, at Curves etc. with contractors own materials (cement, sand aggregate) labour, tools & plants including all royalties and taxes applicable (a) 30 cm X 30 mX 60 Cm pillars at both sidesof piers. | Each | 1180.00 | 630.34 | 7,43,801.2 |
| 5 | Survey of pipe line, cable trenches, gas line, electricity line and OFC etc. to be identified & shown to identify and map all existing underground utilities with in the survey are to prevent accidental damage during future construction activities.1. Utilize GPR data and supplement with electromagnetic locators if necessary to accurately identify various types of utilities. Cross-reference findings with existing utility maps and records. Cross- reference findings with existing utility maps and records. 2. Mapping and Documentation-Mark the locations of identified utilizes on site using temporary markers. Prepare detailed maps including the precise location, depth and type of each utility .Document any discrepancies between the survey findings and existing records. 3. Verification and Validation- Conduct follow-up surveys if initial findings are in conclusive. Validate the accuracy of identified utilities by comparing with physical markers or excavation records where available. | Kilometre | 118.00 | 1,21,633 | 1,43,52,694 |
| Schedule total | ₹7,39,36,369.2 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].