| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | L1 | Accepted-AOC Low Quoted | |
| 2 | L2₹6.9 L+₹2,911.50 (0.42%)Rejected-Finance | L2 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | VTS AND CO L2 | N.K.Kumaresan L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification. for pipe laying works.` | 1,450 | RM (One Running Meter) | 195 ₹2,82,750 | 194 ₹2,81,300 Lowest |
| 2.00 | Supply and delivery of 90 mm PVC pipe 6 Kg/m including cost and conveyance of all materials to site and all charges etc., complete. PVC pipe | 1,450 | RM (One Running Meter) | 232.5 ₹3,37,125 | 232 ₹3,36,400 Lowest |
| 3.00 | PVC Elbow | 10 | No (One Number) | 104.5 ₹1,045 | 104 ₹1,040 Lowest |
| 4.00 | PVC TEE | 8 | No (One Number) | 123.5 ₹988 | 123 ₹984 Lowest |
| 5.00 | PVC Dummy | 5 | No (One Number) | 30 ₹150 | 29.5 ₹147.5 Lowest |
| 6.00 | PVC Pipe joint for 90 mm PVC pipe 6 Kg/m Including cost and conveyance of all materials to site and all charges etc., Complete | 1,450 | No (One Number) | 22.5 ₹32,625 | 22 ₹31,900 Lowest |
| 7.00 | Refilling the excavated earth for dumping the pipe line in proper position with watering and capaciting including cost all labour charges etc, | 1,450 | RM (One Running Meter) | 26.5 ₹38,425 Lowest | 26.5 ₹38,425 Lowest |
Tender Value
₹8.5 L
Closing Date
16 Jul 2025, 3:00 pmClosed
Executive Officer
Sethiyathope TP
Providing new pipeline at Ward 1 in Sethiyathope TP
2025_DTP_578261_1
45/2025
Open Tender
Civil Works
Works
90 days
Sethiyathope
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,500
Yes
15 Oct 2025
5 Jul 2025
16 Jul 2025
5 Jul 2025
16 Jul 2025
5 Jul 2025
5 Jul 2025 - 16 Jul 2025
Amount
Earth Work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification. for pipe laying works.`
Supply and delivery of 90 mm PVC pipe 6 Kg/m including cost and conveyance of all materials to site and all charges etc., complete. PVC pipe
PVC Elbow
PVC TEE
PVC Dummy
PVC Pipe joint for 90 mm PVC pipe 6 Kg/m Including cost and conveyance of all materials to site and all charges etc., Complete
Refilling the excavated earth for dumping the pipe line in proper position with watering and capaciting including cost all labour charges etc,
VTS AND CO (BID ID -1401476)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .