| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 CrAdmitted-Finance CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -28.20% | ₹7.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.1 Cr+₹41.2 L (5.33%)Admitted-Finance | -24.37% | ₹8.1 Cr+₹41.2 L (5.33%) | L2 | Admitted-Finance |
| 3 | L3₹8.6 Cr+₹88.1 L (11.4%)Admitted-Finance | -20.00% | ₹8.6 Cr+₹88.1 L (11.4%) | L3 | Admitted-Finance |
| 4 | L4₹8.9 Cr+₹1.1 Cr (14.8%)Admitted-Finance | -17.55% | ₹8.9 Cr+₹1.1 Cr (14.8%) | L4 | Admitted-Finance |
| 5 | L5₹10.2 Cr+₹2.5 Cr (32.0%)Admitted-Finance | -5.25% | ₹10.2 Cr+₹2.5 Cr (32.0%) | L5 | Admitted-Finance |
Tender Value
₹10.7 Cr
EMD Value
₹21.5 L
Closing Date
23 Aug 2025, 4:00 pmClosed
Executive Engineer RNB Division Chadoora
Executive Engineer RNB Division Chadoora
Up-gradation/ Improvement of Kadalbal Lasjan road by way of Rigid Pavement from RD 1800 TO RD 5000.
2025_PWDJK_283701_1
NIT NO 26
Open Tender
Civil Works
Percentage
730 days
lasjan
as per nit/ sbd
6 documents required · 6 mandatory
₹11,000
Yes
Executive Engineer RNB Division Chadoora
₹21.5 L
Yes
Chief Engineer RNB Central Kashmir
13 Sept 2025
8 Aug 2025
25 Aug 2025
8 Aug 2025
23 Aug 2025
13 Aug 2025
12 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Cement Concrete Pavement | - | - | - | - |
| 1.02 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 10,751.83 | Cum | 187.3 | ₹20,13,817.76 |
| 2 | Reusing / recycling the excavated material available at site after removing material greater than 100mm size and P1 >6 followed by laying and compacting the excavated / recycled material at MDD in layers by using plain PRR 8-10 KN into layers of thickness upto 200 mm per drawing and technical specifications incl loading, unloading, octroi, watering etc complete job as per the directions of site engineer in charge. | 7,082.06 | Cum | 324.38 | ₹22,97,278.62 |
| 3 | Construction of dry lean cement concrete sub base over a prepared sub grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8 10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. | 1,476.9 | Cum | 3,229.8 | ₹47,70,091.62 |
| 4 | Providing and laying of 125 microns HDPE layer as directed by Engineer in Charge complete job. | 16,245.94 | sqm | 30 | ₹4,87,378.2 |
| 5 | Providing and laying design mix cement concrete of M-30 grade, in roads/taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, leveling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints ( 10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in- charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to ,be paid separately). Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. Cement concrete manufactured in automatic batching plant (RMC plant) i/c transportation to site in transit mixer | 5,519.8 | cum | 9,281.45 | ₹5,12,31,747.71 |
| 6 | Add or deduct for using more or less cement in the items of design mix over and above the specified cement content therein. | 1 | qtl | 941 | ₹941 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 4,656.08 | sqm | 286.35 | ₹13,33,268.51 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,20,792 | kg | 123.2 | ₹2,72,01,574.4 |
| 9 | Plastic covering of Dowel bars alternate side for non rigid joint. | 15,810.5 | Rm | 30 | ₹4,74,315 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_873165.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .