Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance BARDHAMAN DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20.0 L
EMD Value
₹25,000
Closing Date
17 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
New Installation and commissioning of 800mm width x 220 mtr long 22KW Vishwa make Pony Belt Conveyor at 12RL and 11R to 12RL and 21R of Jambad Bottom seam at Shyamsundarpur Colliery under Bankola Area.
2023_ECL_274248_1
ECL/GM/BA/E TENDER/22-23/EnM/159 Dt. 07.03.2023
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Shyamsundarpur Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹25,000
18 Mar 2023
7 Mar 2023
18 Mar 2023
7 Mar 2023
17 Mar 2023
7 Mar 2023
7 Mar 2023 - 12 Mar 2023
Amount
Item Description/ Heading
Dismantling of 3 pillars (75 mtr) belt conveyors ( runner, top bracket & foot stools with top & bottom rollers)
Cleaning of discharge drive for dismantling purpose
03 pillar (150 mtr) PVC belt opening
dismantling of discharge unit
dismantling of drive unit (22KW)
New fabrication of 02 no. load table (hopper)
New fabrication of Tail end set
New fabrication of Drive frame and base frame
Refabricating of structure for Discharge unit at UG site at UG site (including transportation of steel materials, gas , welding m/s etc from surface to 112L/11R at jambad Bottom seam
Carrying, Transportation and installation with fitting at 12L/11R to 12L/21R (220 mtr long) (i) Discharge head (unit) and 10 no. of MS joist (girder) and checking plate chute with scrapper etc =2.5 MT (ii) Drive unit with gear and motor (22KW) = 4.50MT (iii) Pressure Drum = 0.50 MT (iv) Tail Enf 01 set = 1 MT (v) 02no. load table (hopper) = 2.00 MT (vi) Starter and switch gear -1 MT (vii) 220 mtr conveyor structure ( 125mm runner) with TOP & bottom rollers 220x55 kg/mtr = 12.10 MT
440mtr PVC belt (800mm) of Transportation & lapping with joint , tensiong , trial run etc
Foundation of down holding bolts of drive unit, discharge base frame & tail end
Carrying & laying of electrical cables from (including carrying & layout of pull cord lighting cable and light fitting)
Cleaning of debris before installation of th belt
Drive & Tail end fencing complete fabrication and fitting
6 ime extension of belt & shifting with installation of hopper & tail end
4 time belt shortening & installation of hopper & tail end
Concreate work for foundation of drive base frame (1:1:5:3)
Providing Bolts & Nut
Total impact of GST for the purpose of CTC
SABIR CONSTRUCTION
BABLU SINHA
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .