Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,085Accepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹96,471+₹386 (0.40%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹96,568+₹483 (0.50%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹96,568
EMD Value
₹1,931
Closing Date
25 Sept 2026, 5:00 pmClosed
EE-I/LDCD
O/O EE-I,LDCD Fuleswar Uluberia Howrah 711316
Emergent restoration of Gazipur Dighirpar Wooden Bridge over Link Channel of Lower Rampur Khal in GP-Gazipur, Block- Amta - II, PS-Amta, Dist-Howrah
2026_IWD_5074269_9
WBIW/EE-I/LDCD/e-SNIT- 4/2026-27
Open Tender
CIVIL WORKS
Percentage
15 days
Amta
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,931
29 Sept 2026
23 Sept 2026
26 Sept 2026
23 Sept 2026
25 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
(a) Width of thinner end above 15 cm.
(i) Jhaw / Eucalyptus. | 24 | Metre | 228.83 | ₹5,491.92 |
| 2 | Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) (a) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard wood as approved by the Engineer-in-charge) | 1.44 | Cum | 58,516.19 | ₹84,087.77 |
| 3 | Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc. complete as per the direction of the Engineer- in- charge. | 17.19 | Kg | 90.58 | ₹1,557.07 |
| 4 | Coal Tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer -in- charge
a) Two coat. | 59.38 | Sqm | 65.55 | ₹3,892.36 |
| 5 | Labour charges for taking out old wood work including cutting bolts and nuts and stacking within a lead of 100 metre etc. complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) | 0.47 | Cum | 3,247.66 | ₹1,539.39 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
Form2911.pdf
Tender Documents • 0.56 MB
9.pdf
Other Document • 0.19 MB
BOQ_5160458.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .