| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC | ₹21.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.2 L+₹2,118.06 (0.10%)Rejected-Finance | ₹21.2 L+₹2,118.06 (0.10%) | L2 | Rejected-Finance L2 |
Tender Value
₹21.2 L
EMD Value
₹42,360
Closing Date
12 Jun 2026, 12:00 pmClosed
EE
VIKAS BHAWAN VARANASI
Chetganj ward sthit Saraygowardhan Mohalle ke vibhinn Galion ka Nirmad ka karya
2026_REDUP_1147360_6
53 DATE 04-04-2026
Open Tender
Civil Works
Percentage
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹42,360
Yes
7 Sept 2026
12 May 2026
12 Jun 2026
12 May 2026
12 Jun 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of chauka stone cleaning and staking including all complite .2015 | 0.8 | cum | - | - |
| 2 | Earthwork in cutting /Filling in Imbankment in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20") in depth and earth work in enbankment to be in 20cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100') lead. the earth form by cartege up to 6km distance as directed by the E/I. S.I. No 253 Analysis | 0.2 | cum | - | - |
| 3 | Disposal of westage | 0.2 | cum | - | - |
| 4 | M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-305 | 1 | cum | - | - |
| 5 | 12 mm thick cement plasterin 1:4 cement morter I/C all material labour T&P proper complition to the work . S.I. No-586 | 0.4 | sqm | - | - |
| 6 | Concrete with 4cm. Gauge approved stone ballast , approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials labour and tools and plants etc . Required for proper completion for the work . SI no. 281 | 0.8 | cum | - | - |
| 7 | Re laying of chauka stone size 0.45x0.45x0.10 m Avg with 1:4 cement morter And joints filling with struct pointing with 1:2 cement morter I/C all material labour T&P Proper complition to the work .(rate As senction SE R.E.D 2017-18) | 0.6 | sqm | - | - |
| 8 | Providing and laying of chauka stone size 0.45x0.45x0.10 m Avg with 1:4 cement morter And joints filling with struct pointing with 1:2 cement morter I/C all material labour T&P Proper complition to the work .(Rate as Senction SE R.E.D 2017-18) | 0.2 | sqm | - | - |
| 9SFRC Medium Duity Mainhole Cover With Frame Size (600x600x75 mm.) | |||||
| 10Galipit | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_2146481.xls
BOQ • 0.28 MB
sbd.pdf
Tender Documents • 1.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .