Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC MIRZAPUR UTTAR PRADESH UP | ₹2.4 Cr Quoted ₹2.5 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.6 CrRejected-Finance 302 1 SHIVKUTI PRAYAGRAJ | ₹2.6 Cr | 2 | Rejected-Finance L2 |
Tender Value
₹3.7 Cr
EMD Value
₹20.3 L
Closing Date
12 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Prayagraj Circle PWD Prayagraj
Renewal with General repair of Samda to Dariyapur via Arka Fatehpuyr Road (ODR)
2026_CEALD_1121056_1
1177/06ComB-Pra.Cir/2026 Dt. 16-02-2026
Open Tender
Civil Works - Roads
150 days
Kaushambi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹20.3 L
Yes
27 May 2026
28 Feb 2026
12 Mar 2026
28 Feb 2026
12 Mar 2026
28 Feb 2026
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Providing and applying tack coat with bitumen VG-10 Grade using Bitumen pressure distributor @ 0.2 kg per sqm on the prepared granular surfaces (treated with primer on new WBM surface only) & cleaned with broom as per Technical Specification Clause 503.
Providing and laying dense graded bituminous macadam with Hire Capcity Batch Type HMP using crushed aggregates of specified grading, premixed with bituminous VG-30 binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (DBM G-2)
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
T2Samda.pdf
Tender Documents • 0.91 MB
BOQ_2085750.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid