| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance ORAI CITY | ORAI | JALAUN | UTTAR PRADESH | L1 | Admitted-Finance | ||
| 2 | L2₹16.1 L+₹1,610.01 (0.10%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹16.1 L
EMD Value
₹33,000
Closing Date
3 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT
EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT JALAUN AT ORAI
Construction work of hall and rooms in Shri Shakyavar Kori Jan Kalyan Parishad District Jalaun place Orai (Kabir Bihar) Umrarkhera Orai
2026_REDUP_1172820_1
08/EE/RED/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
JALAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,000
12 Oct 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 - .5.2.2 | 4.86 | m³ | 7,731.96 | ₹37,577.33 |
| 2 | Foundations, footings, bases of columns, etc. for concrete Shuttering - DSR 2023- 5.9.1 | 64.8 | m² | 279.38 | ₹18,103.82 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 4 coarse sand) .DSR 2023- 6.4.2 | 24.14 | m³ | 6,487.34 | ₹1,56,604.39 |
| 4 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) DSR 2023- 6.13.2 | 54.92 | m² | 800.63 | ₹43,970.6 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 5.30 | 3.59 | m³ | 8,196.85 | ₹29,426.69 |
| 6 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. for concrete Shuttering - DSR 2023- 5.9.15 | 25.94 | m² | 279.38 | ₹7,247.12 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 5.30 | 6.1 | m³ | 8,196.85 | ₹50,000.78 |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. for concrete Shuttering - DSR 2023- 5.9.5 | 54.24 | m² | 524.63 | ₹28,455.93 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 5.30 | 28.14 | m³ | 8,196.85 | ₹2,30,659.36 |
| 10 | roofs, landings, balconies and access platform . for concrete Shuttering - DSR 2023- 5.9.3 | 192.34 | m² | 660.6 | ₹1,27,059.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
08.pdf
Tender Documents • 1.95 MB
BOQ_2202405.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .