RequiredTo qualify for award of the contract, each Bidder in his name should submit certificate issued by an Engineer not below the cadre of Divisional Engineer for the works executed in any one year during the last 10 financial years. The date of work commencement, completion along with Agreement No. should be invariably furnished in the performance /past experience certificate issued by the concerned Engineer in the enclosed format only.
RequiredThe experience certificate is Mandatory (iii) Line (33KV): To qualify for award of the contract, as a Prime contractor should have executed the erection and commission of 50% (1.4KM) of bid quantity (0.7KM) of 33KV line or Higher Voltage line is required on Partial Turn Key Basis in any one year during preceding ten financial years. i.e from 2015-16 to 2024-25.
Required 50% Quantity of the route length of bid quantity i.e. 0.7 KM in any one year executed during preceding ten financial years i.e from 2015-16 to 2024-25 on Partial Turn Key Basis.
Required Quantity of 9 No. M type or L type or H type towers or higher type in any one year executed during preceding ten financial years i.e from 2015-16 to 2024-25 on Partial Turn Key Basis.
RequiredThe bidder should produce financial turn over during the last TEN years (FY 2015-16 to 2024-25). Certificate issued by Registered Chartered Accountant with UDIN (Unique Document Identification Number) must be uploaded. The certificate is mandatory.
RequiredThe Bidder should have the bid capacity not less than the estimated contract value or value of work put to tender. The bid capacity will be calculated as per formula (2 AN-B)>ECV for others and 3 AN-B>ECV for SC/STs, Waddera and Sagara (Uppara) Contract Co-operative Societies and individuals belonging to the said communities
Required(or) (ii) The bidder shall produce a declaration as mentioned in the BID Document on a non-judicial stamp paper of Rs.200/- duly notarized.Either (i) or (ii) documents are Mandatory
RequiredThe bidder should have valid A-grade License issued by Electrical Inspector/ Valid Electrical Contract License from any State Govt. and produce at the time of submission of bid. The Certificate is mandatory.
RequiredThe bidder should produce valid Firm Registration in TSNPDCL before issuing of LoA.
RequiredThe bidder should produce valid PAN before issuing of LoA
RequiredThe bidder should produce valid GST registration number before issuing of LoA.
RequiredThe bidder should produce valid EPF registration number before issuing of LoA.
RequiredThe sub contractor certificate must be issued by agreement concluded authority only.
RequiredBid security @2% on ECV should be submitted at the time of submission of Bid. As per N.O.O(CS).Ms.No.79, Dt:31.01.2020 Contractors belonging to SC/STs, Waddera and Sagara (Uppara) Contract Co-operative Societies and individuals belonging to the said communities EMD is exempted ?upto 1 crore? works only.
Requiredfor exemption of EMD, community certificate of the firm?s proprietor is to be uploaded. This certificate is mandatory.