Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LQualified 901 GH 83 SECTOR 20 PANCHKULA 134116 | PANCHKULA | HARYANA | 134116 | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹3.3 L+₹36,660 (12.7%)Qualified 00 BHAGWAT SADAN NEAR V N ACADEMY SCHOOL SHIV NAGAR COLONY FAIZABAD UTTAR PRADESH 224123 UDYAM UP 24 0031338 | AYODHYA | UTTAR PRADESH | 224123 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹3.8 L+₹89,590 (31.0%)Qualified | L3 | Qualified MSE, MII, Category: General | |
| 4 | L4₹3.8 L+₹92,260 (31.9%)Qualified 0 AZAD NAGAR GADI GARH JAMMU JAMMU JAMMU KASHMIR 181101 | JAMMU | JAMMU AND KASHMIR | 181101 | L4 | Qualified MSE, MII, Category: General |
Tender Value
₹5 L
EMD Value
Exempted
Closing Date
31 Jan 2022, 4:00 pmClosed
Repair and unserviceable transformer 500 KVA
3095578
GEM/2022/B/1901482
Repair and unservicabel transformer 500 KVA at N area under GE Chandigarh
15 days
Chandigarh; Chandigarh
Total value wise evaluation
BOQ
6 documents required · 6 mandatory
2 yrs
₹3 L
₹5 L
40%
Exempted
31 Jan 2022
28 Jan 2022
31 Jan 2022
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Repair and unservicabel transformer 500 KVA at N area under GE Chandigarh | Disconnecting defective outdoor/ indoor power distribution transformer of capacity 500 KVA from HT/ LT sides draining out complete transformer oil & storing the same in suitable containers ( to be arranged by contractor ) opening the top cover and lifting up the core assembly carefully to check the condition of transformer winding core retanking the same after repair refilling the transformer oil after dehydration and filteration (dehydration and filteration to be paid separately) including checking of leakage of transformer body and welding works required for making transformer body leak proof transportation of transformer to and from site to work shop and re-installation the same at any site complete all as specified and directed -01Each job
M&L for replacement of burnt /defective HT copper coil with new one made out of super enamelled heavy duty copper wires of size matching to the existing one including varnishing, drying and insulating material in transformer complete all as specified and directed-135.00 Kgs
M&L for replacement of burnt /defective LT copper coil with new one made out of super enamelled heavy duty copper wires of size matching to the existing one including varnishing, drying and insulating material in transformer complete all as specified and directed-98.00 Kgs.
M&L for Replacement of existing defective HT tap changer of suitable size with tapping arrangement 2.5%to 7.5% and one normal tapping including connecting up with HT coil and testing of transformer capacity 500 KVA complete all as specified and directed-
M & L for replacement of synthetic rubberised cork sheet gasket 1/4" thick suitablefor main body top cover of transformer. Capacity 500 KVA complete all as specified and directed-01Each
M & L for Replacement of defective/ cracked HT porcelain bushing (set of three) of suitable size for transformer 500 KVA including washers of good quality complete all as specified and directed-01Each Set
M&L for replacement of defective/ cracked LT porcelain bushing (set of four) of suitable size of transformer 500 KVA including washers of good quality complete all as specified and directed-01Each
Supply and fix in repair HT bush rod made out of copper with brass nuts and washers of required length and dia (as per existing) including connecting up with HT coil of transformer 500 KVA complete all as specified and directed-01Each Set
Supply and fix in repair HT bush rod made out of copper with brass nuts and washers of required length and dia (as per existing) including connecting up with HT coil of transformer 500 KVA complete all as specified and directed-01Each Set
Supply and fix in repair breather with transparent body of suitable size duly filled with fresh silica gel complete for transformers of cap 500 KVA complete all as specified and directed-01Each
Testing of transformer oil of each transformer before and after dehyderation and filteration of transformer oil, installed in different sites for its dielectric strength and submitting the test report to the department.complete all as specified and as directed.
Note : 1. Contractor shall arrange the oil testing machine and install at MES complaint cell of respective area. 2. Oil sample shall be collected from transformer in a air tight container and shall be tested at MES complaint cell of respective area in presence of MES rep-01Each Job
Supply and filling transformer oil for topping up the level of oil/ new filling, having dielectric strength 40 - 60 KV during filling after initial filteration, conforming to relevent IS-335 (Transformer oil to be supplied in sealed container) complete all as specified and directed. Make: Power/Insole/gulf -
Painting of transformer 500 KVA capacity with good quality synthetic enameled paint using spray gun with compressed air on complete external portion of transformer including preparation of surface by scrubbing, cleaning ,stains greasy spots, dusts etc, The painting of transformer shall be carried out in situ ie. on four pole structure or in sub station at different places including writting SM/MES number complete all as specified and directed-01Each Job | 1 | Job | CHANDIGARH | 15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3095578.pdf
GEM_BID
specificaiton-of-data-1_2022-01-28-15-40-08_ccfae54934f78d56f5697569daedf0b6.pdf
BOQ
boq-2022_2022-01-28-15-40-08_0f40fb6d5e96a62bf700933fbecd168a.csv
BOQ
termsCondition.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .