| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC GRAM KHUSHHALPUR DIWAN SINGH TEHSIL NAGINA DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | ₹1.0 Cr | L1 | Accepted-AOC Responsive |
| 2 | L2₹1.1 CrRejected-AOC GRAM NAURANGABAD THANA DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | NAURANGABAD | BIJNOR | UTTAR PRADESH | ₹1.1 Cr | L2 | Rejected-AOC Responsive |
| 3 | L3₹1.1 CrRejected-Finance | ₹1.1 Cr | L3 | Rejected-Finance Responsive |
Tender Value
₹1.4 Cr
EMD Value
₹8.8 L
Closing Date
27 Apr 2026, 12:00 pmClosed
SE rampur circle, PWD. rampur
office of SE rampur circle, PWD. rampur
Construction of 5X5 mtr 5 Cell RCC Box culvert in place of damaged culvert on Badhapur Ramjiwala road in km-4 in District Bijnor.
2026_CEMBD_1139672_3
2007/E-Nivida-R.Circle/25-26 Dt. 29.03.2026
Open Tender
Civil Works - Bridges
Najibabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹8.8 L
office of SE rampur circle, PWD. rampur
30 May 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). SI. No. 694 Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Cum | - | - |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI. No. 692. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Cum | - | - |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. complete as per MORTH Specification Clause 304. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Cum | - | - |
| 4 | PCC Grade M15 (1:2:4) Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.. As per MORTH Specifications Clause 15.11(M-15). Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Cum | - | - |
| 5 | RCC Grade M25 Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications. complete as per MORTH IInd Revision 2019 Specification Clause 1500,1700& 2100.. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Cum | - | - |
| 6 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications complete as per MORTH Specification 1600. As per Sr. No. 15.13. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | MT | - | - |
| 7 | Supplying & Fixing PVC pipe for bridge work of pressure 6 kg/cm² of 100mm internal dia including cost of all materials, labour and T&P etc. required for proper completion of work as per item no. 24, ch. 1 of PWD S.O.R.(for weep hole).. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Rm | - | - |
| 8 | Flexible Apron : Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. As per MORTH 2507.2, Sr. No. 16.11.. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Cum | - | - |
| 9 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm as per MORTH Specification 800. As per Sr. No. 14.16. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Sqm | - | - |
| 10 | Construction of embankment with approved material obtained from borrow pits with all lifts and 2 Km leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.. Including cost of All material, labour cess, Royalty, T&P, all taxes but excluding cost of GST. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.69 MB
T203.pdf
Tender Documents • 1.09 MB
BOQ_2128083.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid