| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.0 LAccepted-Finance | ₹44.0 L | L1 | Accepted-Finance low |
| 2 | L2₹44.0 LRejected-Finance | ₹44.0 L | L2 | Rejected-Finance high |
| Sl No | Description | Qty | Unit | R SURESH L2 | BALAKUMAR R L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Health Sub Center at Vengatachalapuram in Vengatachalapuram Panchayat. Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 186.33 | Cum | 246.39 ₹45,909.85 | 246.5 ₹45,930.35 |
| 2.00 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 23.07 | Cum | 1,857 ₹42,840.99 | 1,857.1 ₹42,843.30 |
| 3.00 | Plain Cement Concrete: 1:4:8 - One part Cement:Four part Sand:Eight part hard broken stone jelly using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick,well rammed,consolidated and curing etc.complete complying with standar specification. | 23.73 | Cum | 5,309 ₹1.3 L | 5,309 ₹1.3 L |
| 4.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 130.41 | Cum | 42.8 ₹5,581.55 | 42.8 ₹5,581.55 |
| 5.00 | Supplying and filling of good earth locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 13.93 | Cum | 222.1 ₹3,093.85 | 222.1 ₹3,093.85 |
| 6.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).Upto Basement | 201.64 | Sqm | 516.5 ₹1.0 L | 516.5 ₹1.0 L |
| 7.00 | Ground Floor | 268.64 | Sqm | 1,033 ₹2.8 L | 1,033 ₹2.8 L |
| 8.00 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement ratio with plasticizer using 20mm and down concrete structural elements under controlled water graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, fixing, fan clamps etc., as per standard specification and as directed by the depart- mental officers comple.-1m3 Foundation & Basement | 36.34 | Cum | 9,093.7 ₹3.3 L | 9,093.7 ₹3.3 L |
| 9.00 | Ground Floor | 28.32 | Cum | 9,225.5 ₹2.6 L | 9,225.5 ₹2.6 L |
| 10.00 | Steel - Fe 500 : Supply, fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. complete and supply & use of 18G black annealed binding wire double fold to tie the bars in position and providing precast cement/ PVC cover blocks for main reinforcement to ensure specified cover and complete., including all labor charges etc as directed by departmental officers. | 7 | MT | 89,890.8 ₹6.3 L | 89,890 ₹6.3 L |
Tender Value
₹45 L
EMD Value
₹45,000
Closing Date
16 Jul 2025, 3:00 pmClosed
Block Development Officer(BPts)
Block Development Officer(BPts),Panchayat union Office Uppiliyapuram
Construction of Health Sub Center at Vengatachalapuram in Vengatachalapuram Panchayat.
2025_RDTN_581099_1
A2/3419/2024 Dated 01.07.2025
Open Tender
Civil Works - Buildings
30 days
Uppiliyapuram
PleaseReferDocuments
5 documents required · 5 mandatory
₹0
₹45,000
Yes
15 Jun 2026
12 Jul 2025
16 Jul 2025
12 Jul 2025
16 Jul 2025
12 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf