| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.5 L+₹857.64 (0.24%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹857.64 (0.24%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | ARV AND CO L1 | Senthil & Co L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Providing existing damaged BT Road Cutting as per the direction of departmental officers etc., Complete WD-W0739 | 8 | m3 | 950 ₹7,600 | 931.4 ₹7,451.2 Lowest |
| 2.00 | 2.Dismantling the Existing damaged R.C.C slab as per the direction of departmental officers etc., Complete | 2 | m3 | 3,500 ₹7,000 Lowest | 4,513.49 ₹9,026.98 |
| 3.00 | 3. Dismantling the Existing damaged PCC as per the direction of departmental officers etc., Complete | 3 | m3 | 450 ₹1,350 Lowest | 509.3 ₹1,527.9 |
| 4.00 | 4.Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 32 | m3 | 220 ₹7,040 | 187.2 ₹5,990.4 Lowest |
| 5.00 | 5.Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 2 | m3 | 4,500 ₹9,000 Lowest | 5,073.59 ₹10,147.18 |
| 6.00 | 6.Supplying and laying of Stone ware pipe including necessary jointing materials link, cement etc. complete for 230 mm dia pipe. | 30 | m | 900 ₹27,000 Lowest | 1,070.89 ₹32,126.7 |
| 7.00 | 7.Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as Vertical walls etc, using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 70 | m2 | 600 ₹42,000 Lowest | 909 ₹63,630 |
| 8.00 | 8.Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm gauge hard broken granite stone jelly for all CC items of work excluding centering, shuttering and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by Deparmental officer etc., complete. | 10 | m3 | 7,300 ₹73,000 | 6,184.08 ₹61,840.8 Lowest |
| 9.00 | 9.Supplying and erecting CENTERING for sides and sofits including supports and strutting up to 3.29 m high for plane surfaces such as RCC SLABS, with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over country wood joists of size 10cm X 6.50cm spaced at about 90cm centre to centre and supported by Casuarinas props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed. | 24 | m2 | 1,100 ₹26,400 | 1,005 ₹24,120 Lowest |
| 10.00 | 10.Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification. | 4.5 | Qtl | 10,000 ₹45,000 | 8,120.36 ₹36,541.62 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
21 Sept 2026, 3:00 pmClosed
The Assistant Commissioner, Central zone
Central Zone Coimbatore Corporation
Reconstruction of Under Ground Drainage Chamber Rising and Replacement of Sewer Pipeline at Ward areas in ward No. 68 Central Zone, Coimbatore Corporation.
2026_MAWS_701154_17
e3/2026 Central zone
Open Tender
Civil Works
Works
120 days
Coimbatore corporation-
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
22 Sept 2026
4 Sept 2026
22 Sept 2026
4 Sept 2026
21 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Providing existing damaged BT Road Cutting as per the direction of departmental officers etc., Complete WD-W0739 | 8 | m3 | - | - |
| 2 | 2.Dismantling the Existing damaged R.C.C slab as per the direction of departmental officers etc., Complete | 2 | m3 | - | - |
| 3 | 3. Dismantling the Existing damaged PCC as per the direction of departmental officers etc., Complete | 3 | m3 | - | - |
| 4 | 4.Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 32 | m3 | - | - |
| 5 | 5.Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 2 | m3 | - | - |
| 6 | 6.Supplying and laying of Stone ware pipe including necessary jointing materials link, cement etc. complete for 230 mm dia pipe. | 30 | m | - | - |
| 7 | 7.Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as Vertical walls etc, using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 70 | m2 | - | - |
| 8 | 8.Cement concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm gauge hard broken granite stone jelly for all CC items of work excluding centering, shuttering and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by Deparmental officer etc., complete. | 10 | m3 | - | - |
| 9 | 9.Supplying and erecting CENTERING for sides and sofits including supports and strutting up to 3.29 m high for plane surfaces such as RCC SLABS, with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over country wood joists of size 10cm X 6.50cm spaced at about 90cm centre to centre and supported by Casuarinas props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed. | 24 | m2 | - | - |
| 10 | 10.Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification. | 4.5 | Qtl | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
TD.pdf
Tender Documents • 0.46 MB
BOQ_843175.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .