Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.4 L+₹47,849.08 (5.34%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹9.5 L+₹56,248.92 (6.28%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹9.6 L+₹64,513.76 (7.20%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹10.0 L+₹1.0 L (11.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
24 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Kupwara
Executive Engineer RnB Division Sulkote Kupwara
Construction/Upgradation of peer Baba Hirri road
2026_PWDJK_324807_9
NIT No. 48 of 2026-27 of RnB Division Kupwara
Open Tender
Civil Works
Item Rate
21 days
Hirri
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer RnB Division Kupwara
₹30,000
28 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of Foot Culvert and removing of Dismentaled material from site | 1 | Lumsum | 6,000 | ₹6,000 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 36.45 | cum | 256.85 | ₹9,362.18 |
| 3 | Providing and laying of dry stone soling (hand packed tightly ) in consolidated and ramming, including all leads, lifts all carriage complete job . | 3.38 | cum | 1,000 | ₹3,380 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.38 | cum | 5,202.9 | ₹17,585.8 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 25.62 | cum | 5,733.6 | ₹1,46,894.83 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 42.87 | cum | 7,788.4 | ₹3,33,888.71 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) | 168.41 | sqm | 628.95 | ₹1,05,921.47 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 55.6 | sqm | 718.2 | ₹39,931.92 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 6,001.87 | kg | 123 | ₹7,38,230.01 |
| 10 | Back filling behind by dry Stone duly hand packed (Quarry) & consolidated with hand rammers incl. all carriage complete Job. | 63.75 | cum | 800 | ₹51,000 |
stage.html
html • 0.03 MB
finance_1096039.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_1096039.xls
BOQ • 0.41 MB
corrigendum_48_50.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .