Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.9 L+₹1.7 L (15.2%)Rejected-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L2 | Rejected-AOC L2 | |
| 3 | L3₹12.9 L+₹1.7 L (15.2%)Rejected-AOC NO 9 1ST FLOOR C J N HERITAGE PWD MAIN ROAD AKASH NAGAR B NARAYANAPURA DOORAVANI NAGAR BANGALORE 560016 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560016 | L3 | Rejected-AOC L3 | |
| 4 | L4₹13.1 L+₹1.9 L (17.2%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹13.8 L+₹2.7 L (23.9%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
21 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri Vineet Modi
CWE AF North Bangalore Bellary Road JC Nagar Post Bangalore 560006
COMPREHENSIVE MAINTENANCE OF AC PLANTS AT VARIOUS LOCATIONS UDER GE (AF) MARATHAHALLI
2020_MES_394364_2
87572CWEAFNMAR
Open Tender
Miscellaneous Works
Item Rate
330 days
GE AF MARATHAHALLI
AS PER NIT
5 documents required · 5 mandatory
₹500
GE AF MARATHAHALLI
₹24,000
Yes
11 Mar 2021
1 Jan 2021
23 Jan 2021
1 Jan 2021
21 Jan 2021
9 Jan 2021
2 Jan 2021 - 6 Jan 2021
60 days
Amount
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables and spare parts of central chilled water type AC plant 75TR x3 Nos (2x75 running, 1x75 ton standby) comprising of chiller unit with semi hermetic reciprocating compressor, chiller, condenser, refrigerating piping/controls and microprocesser control panel - 3 sets, chiller water pump set-20 HP capacity - 02 Nos. with chiller water pipe line and valves, condenser water pump set 30 HP capacity - 02 Nos with pipe line and valves, forced air FRP cooling tower with fan motor -01 Set, AHU with motor having capacity 20 HP -02 sets, GI sheet ducting, grills, fire damper, and strip heaters humidifier with pump set, MCC - 01 set,power and control wiring all as specified and directed by Engr-in-charge for smooth and efficient performance of AC plant to achieve desired inside conditions 20+/- 2degree C through out the year at SDI including submission of check list duly signed by contractor. Make of plant - Blue Star Note :- i) The Deptt will handover AC plant in operating state condition as is what is basis to the firm. The firm shall have a visit to the site before their quotings and firm is responsible to handed over back AC plants to Deptt in operational condition in all respects while issue of completion certificate by Deptt to firm. (ii) Maintaining the plant at good working condition & desired condition of 23 C+/-2 C and relative humidity 55% +/-5% (iii) The items/works sch No. 17 to 35, 40 to 48 here-in-after mentioned are not covered under comprehensive maintenance quoted rate by the firm and however other all items/ works and maintenance of GI/GSS ducting, adjustment of grills, repairs to grills to achieve proper flow of conditioned Air amount is deemed to be included in the comprehensive maint rate quoted by the firm for efficient functioning of the plants and also labour element amount for item No. 36 to 39 included in the comprehensive maint all as directed by Engineer-in-charge. (iv) All instruments, tools & plants and equipment/air blower required to clean/check/repairs to be provided by contractor (v) The rates quoted by the tenderer shall be inclusive of credit for the retrieved unserviceable spares. (vi) A record of repairs carried out in each visit of AC PLANT installation to be maintained separately duly signed by Contractor, JE and Engineer-in-charge. The maintenance certificate duly signed by contractor and concerned JE E/M and Engineer-in-Charge seperately of AC Plant every month. (vii) The contractor to collect the complaint register daily and on completion/rectification of complaint the register will be updated and signed. The firm should provide suitable competent number of skilled AC mechanics and if any AC plant unserviceable at site, within 1 hr the AC mechanic should attend the complaint and the complaint to be resolved without any further delay. In case the problem could not be solved due to want of spres etc the matter to be informed to the contractor as well as to the concerned JE/AGE E&M. (viii) If the firm failed to provide skilled AC Mechanics and helper as per fault at the time of any AC Complaint a recovery @ of Rs. 300/- per hour will be recovered from the Contractors dues wef the time of lodging of the complaint to till next/completion of 24 hrs also in case of any AC Plant repair for want of spares the Contractor should provide the spare parts in time of with in 24 hours the AC Plant should be made serviceable failing which a sum @ of Rs. 500/- per hour wef the time after 24 hours shall be recovered from the Contractors due. (ix) The Contractor should keep all the spare parts intact for the AC plant in the AC plant Room. (x) The firm is responsible to purchace spare parts as required for day to day comprehensive maint shall be procured from AC Plant original manufacturers/auth distributor/dealer only and the GST vouchers to be submitted to Deptt while claiming payments. .
Comprehensive maintenance (daily/ monthly check) including first hand repairs with consumables for day to day maintenance of package type AC plant 10TR -3 Nos & 11(2x5.5) TR-01 Nos capacity comprising of sealed compressor, refrigerant piping and controls, MCC, power and control wiring, blower motor, air cooled condenser and condenser fan motor etc all as specified and directed by Engr-in-Charge for smooth and efficient performance of Package AC plant to achieve desired inside condition throughout the year at Telemetry Bldg(P-41 Bldg) ASTE, Make- Blue Star
All as per item No. 2 above, but 5.5 TR x 02 Nos capacity installed at P 11 Hangar ( AFNET SITE-II) at ASTE all as specified and directed by Engr-in-Charge. Make- VOLTAS
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 8.75 TR-01 No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-01 No all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Nagesh Auditorium to achieve desired inside condition AT IAM. Make- HITACHI
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 11TR-01 No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Engineer Auditorium to achieve desired inside condition at IAM. Make- HITACHI
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units (5.5TR-02 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Nagesh Auditorium-01 & Engineer Auditorium-01 to achieve desired inside condition at IAM . Make- LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units (11 TR-03 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of P2 Bldg (AVIONICS LAB) to achieve desired inside condition at ASTE. Make- Blue Star
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 5.5TR-04 No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for SIM -I & II Lab at SDI. Make- LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 5.5TR-02 No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for CLASS ROOM at SDI. Make- LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units (5.5TR-02 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of P1 Bldg (AFNET -SITE -I) to achieve desired inside condition at ASTE.Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for Package split AC units ( 5.5TR-01No) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-02 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for ASTE EL TA LAb. Make -VOLTAS
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Air cooled type out door chilling package for ductable package AC units 28.4 TR comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-04 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for MIG 29 at SDI . Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Air cooled type out door chilling package for ductable package AC units( 34x2) 68 TR comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-04 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for ASTE (new hanger) , make Blue star
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumablesfor day to day maintenance for ductable split AC units ( 11TR- 1 Nos) comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-03 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning of Engnieer Auditorium to achieve desired inside condition at IAM. Make -LG
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Air cooled type out door chilling package for ductable package AC units 11X 3 TR nos comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning at IAM CHILLER PLANT, Make - Voltas
Comprehensive maintenance (daily/ monthly check) including first hand repairs with all consumables for day to day maintenance Digital Scroll type centralised AC plant (VRF type ) (5.5 TR X 3 Nos) consider as a one unit x 3 nos and including 21 Nos indoor units ie. fan coil unit comprising of sealed compressors, refrigerant piping and controls, remote operating devices, MCC, power and control wiring, air cooled condensers-09 Nos all as specified and directed by Engr-in-Charge for smooth and efficient performance Airconditioning to achieve for HPHC at IAM , Make - Voltas Note for item No 2 to 16 :- i) The Deptt will handover Package/ ductable/ VRF AC Plant in operating state condition as is what is basis to the firm. The firm shall have a visit to the site before their quotings and firm is responsible to handed over back AC plants to Deptt in operational condition in all respects while issue of completion certificate by Deptt to firm. (ii) Maintaining the plant at good working condition & desired condition of 23 C+/-2 C and relative humidity 55% +/-5% (iii) The items/works sch No. 17 to 35, 40 to 48 here-in-after mentioned are not covered under comprehensive maintenance quoted rate by the firm and however other all items/ works and maintenance of GI/GSS ducting, adjustment of grills, repairs to grills to achieve proper flow of conditioned Air amount is deemed to be included in the comprehensive maint rate quoted by the firm for efficient functioning of the plants and also labour element amount for item No. 36 to 39 included in the comprehensive maint all as directed by Engineer-in-charge. (iv) All instruments, tools & plants and equipment/air blower required to clean/check/repairs to be provided by contractor (v) The rates quoted by the tenderer shall be inclusive of credit for the retrieved unserviceable spares. (vi) A record of repairs carried out in each visit of AC PLANT installation to be maintained separately duly signed by Contractor, JE and Engineer-in-charge. The maintenance certificate duly signed by contractor and concerned JE E/M and Engineer-in-Charge seperately of AC Plant every month. (vii) The contractor to collect the complaint register daily and on completion/rectification of complaint the register will be updated and signed. The firm should provide suitable competent number of skilled AC mechanics and if any AC plant unserviceable at site, within 1 hr the AC mechanic should attend the complaint and the complaint to be resolved without any further delay. In case the problem could not be solved due to want of spres etc the matter to be informed to the contractor as well as to the concerned JE/AGE E&M. (viii) If the firm failed to provide skilled AC Mechanics and helper as per fault at the time of any AC Complaint a recovery @ of Rs. 300/- per hour will be recovered from the Contractors dues wef the time of lodging of the complaint to till next/completion of 24 hrs also in case of any AC Plant repair for want of spares the Contractor should provide the spare parts in time of with in 24 hours the AC Plant should be made serviceable failing which a sum @ of Rs. 500/- per hour wef the time after 24 hours shall be recovered from the Contractors due. (ix) The Contractor should keep all the spare parts intact for the AC plant in the AC plant Room. (x) The firm is responsible to purchace spare parts as required for day to day comprehensive maint shall be procured from AC Plant original manufacturers/auth distributor/dealer only and the GST vouchers to be submitted to Deptt while claiming payments.
Dismantling and taking down of condensor fan motor of 1 HP from 5.5/8.75 TR ductable split AC rewinding the burnt copper conductor with new copper wire including best quality insulating materials and replacing bearings 2 Nos, transporting to outside workshop & back, refixing, testing and commissioning all as directed by Eng - in - Charge.
Dismantling and taking down of condensor fan motor of 2 HP from 11 TR ductable split AC rewinding the burnt copper conductor with new copper wire including best quality insulating materials and replacing bearings 2 Nos, transporting to outside workshop & back, refixing, testing and commissioning all as directed by Eng - in - Charge. Note : for Sl No 17 & 18 :- The item to be issued to the firm as and when repairs required on the site through gate pass duly signed by the Garrison Engineer.
Supply, fixing and testing condensor fan blade suitable for 5.5 TR ductable split AC suitable for site requirements all as directed by Engr - in - Charge
Disconnecting and replacing compressor contactor of 40 Amps suitable for site requirements all as directed by Engr - in - Charge
Disconnecting and replacing chiller motor contactor of 32 Amps suitable for site requirements all as directed by Engr - in - Charge
Isolating and Labour the monoblock pumpset from position after disconnecting power and piping, transporting to workshop for overhauling the mono block pump set , 2850 Rpm 5 HP by replacing the bearing /bushes etc from both the motor and pump and refixing the same ,connecting up the power and water piping, testing and commissioning all as directed by Engineer-in-charge. Note : The item to be issued to the firm as and when repairs required on the site through gate pass duly signed by the Garrison Engineer.
Material & Labour for Over load protector of capacity 63Amp, 415V, relay range 20-33 Amps suitable for site requirements all as directed by Engr - in - Charge
Material and Labour for replacing water pressure guage 0-7kg/15kg suitable for site requirements all as directed by Engr - in - Charge
Material and Labour for replacing U/s panel push button assy ON/ OFF suitable for site requirements all as directed by Eng - in - Charge.
Material and Labour for replacing of Rotary switches suitable for site requirements all as directed by Eng - in - Charge
Material and Labour for dismantling & Servicing of AHU Motor of capacity 20 HP by greasing to DE/NDE ball and roller bearings, refixing and commissioning suitable for site requirements all as directed by Engr - in - Charge
Material and Labour for R-22 refrigeration gas suitable for site requirements all as directed by Eng - in - Charge.
Material and Labour for Refrigeration gas R-407C suitable for site requirements all as directed by Eng - in - Charge
Disconnecting the electric /water connections of chilled water pump set monoblock type of capacity 20 HP and taking down from position and transporting to workshop for repair/rewinding. Dismantling the electric motor and taking out the burnt out copper winding from the slots, cleaning the slots and rewinding with suitable gauge of copper winding wire including the insulation and heating and refixing the motor after replacing the following worn out parts, Insulating the pump set ,commissioning/installing and testing after reconnecting the electric/water connections complete all as directed by Engineer-in-charge. (a) Ball bearing - 02 Nos (b) SS sleeves - 02 Nos (c) Gun metal bush - 02 Nos
Disconnecting the electric connection from the cooling tower, taking out the fan and motor from the cooling tower of 10 HP capacity, servicing the fan and motor by greasing, oiling, varnishing, including heating etc and replacing the ball bearing-02 Nos, refixing the fan and motor to its original place and testing complete all as directed by Engineer-in-charge. Note : for Sl No 30 & 31 :- The item to be issued to the firm as and when repairs required on the site through gate pass duly signed by the Garrison Engineer.
Taking out the unserviceable OP cut out complete, supply and fix new OP cut out switch of type MP-55 suitable for site requirements all as directed by Engr - in - Charge
Taking out the unserviceable Power contactor and supply and fix Power contactor of the MN -16 type suitable for site requirements all as directed by Engr - in - Charge
All as per item No 33 but MN - 25/32 type suitable for site requirements all as directed by Engr - in - Charge
Taking out the unserviceable star delta Starter timer Model –0313, supply and fix timer for star delta starter suitable for site requirements all as directed by Engr - in - Charge
Supply only of oil pump for preventive maintenance of A/C plant of capacity 225 TR aggregate in 3 units at SDI suitable for site requirements all as directed by Engr - in - Charge
All as per item No 36 above but oil filter .
All as per item No 36 above but crankcase Heater 230 V
All as per item No 36 above but drier core
Taking down Unserviceable phase preventer and S& F Phase preventer for 5.5 Ton Tonsuitablesuitable for site requirements all as directed by Engr - in - Charge
Taking down Unserviceable HP/LP Cut out, supply and fixing HP/LP Cut out for Ductable spilit AC suitable for site requirements all as directed by Engr - in - Charge
Taking down Unserviceable VPD and S& F VPD for 5.5 ton Ductable split AC suitable for site requirements all as directed by Engr - in - Charge
Taking down Unserviceable Split VPD, Supply and fixing Split VPD for 33 TR package chiller Make - Voltas for operating voltage of 320-500 VAC suitable for site requirements all as directed by Engr - in - Charge
Taking down Unserviceable PCB, S& F remote PCB assembly for 5.5 TR ductable split AC suitable for site requirements all as directed by Engr - in - Charge .
Taking down Unserviceable Air release valve, supply and fixing Air release valve suitable for site requirements all as directed by Engr - in - Charge .
Taking down Unserviceable digital thermo meter with sensor, supply and fixing IN/OUTLET digital Themometer with sensor complete suitable for site requirements all as directed by Engr - in - Charge
Taking down Unserviceable water pressure Gauge, S&F Water pressure Gauge 100 mm dia with siphon set along with brass adaptor complete suitable for site requirements all as directed by Engr - in - Charge.
Taking down Unserviceable Water flow switch, S&F Water flow switch complete suitable for site requirements all as directed by Engr - in - Charge
M&L for servicing AHU of AC plant 75 TR including cleaning accessories ducts,filters, cooling coil greasing bearing, checking the alignment etc and servicing to blower motor by replacing bearing/ bushes etc and greasing oiling and refixing the same testing and commissioning suitable for site requirements all as directed by Engr - in - Charge .
Material and labour for descaling the condenser of capacity 75 TR after dismantling the inlet and out let water connections providing the necessary dummies and circulating descaling acid with help of external pump, brushing the condenser tubes removing the scale neutralizing the base of tubes by circulating neutralizing agent replacement of rubber gasket for the end covers of the condenser removing the dummies connecting the water pipe line connections removing the air lock testing and commissioning complete suitable for site requirements all as directed by Engr - in - Charge. Note for Sl No. 17 to 50 :- Thr firm is reponsible to purchace spare parts as required shall be procured strictly from AC Plant original manufacturers/auth distributor/dealer only and the GST vouchers to be submitted to Deptt while claiming payments.
devan enterprises
Glacier Cooling Solutions Private Limited
CHAVA CONSTRUCTIONS AND ELECTRICAL PROJECTS
R Tech Mech
RAHUL ENTERPRISES
SREE VARU ELECTRICALS
RAMESH BABU CO
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .