Loading…
Loading…
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
21 Jul 2026, 4:30 pm
Executive Enineer Jal Shakti Hyd Div Ramban
Executive Engineer Jal Shakti Hyd Division Ramban
Refer to BOQ
2026_IFC_314593_1
e-NIT No. 14 of 2026-27
Open Tender
Civil Works
30 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer Jal Shakti Hyd Division Ramban
₹11,000
Yes
6 Jul 2026
6 Jul 2026
22 Jul 2026
6 Jul 2026
21 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5m in widthaswell as10m2 on plan)includingdisposal ofexcavated earth lead upto 50meters and lift upto 1.5 m,as directed by Engineer-in-Charge. All kinds of soil: | 46.02 | cum | 592.9 | ₹27,285.26 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 35.18 | cum | 5,733.6 | ₹2,01,708.05 |
| 3 | Dumping of stones in horizontal including cost of stones. | 7.67 | cum | 937.9 | ₹7,193.69 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 152.3 | Sqm | 286.35 | ₹43,611.11 |
| 5 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 gradedstone aggregate) finished with a floating coat of neat cement including cement slurryand curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20mm nominal size stone aggregate. | 22 | Sqm | 510.25 | ₹11,225.5 |
| 6 | 12mm Cement plaster of mix 1 :4 ( 1 cement : 4 fine sand ) | 49.5 | Sqm | 283.8 | ₹14,048.1 |
| 7 | Labour engaged for stretching of steel wire rope
Fitter | 3 | Day | 734 | ₹2,202 |
| 8 | Labour engaged for stretching of steel wire rope
Labour | 6 | Day | 553 | ₹3,318 |
| 9 | Carriage of Cement from nearest source to site of work Av. 4000 mtr by manual means. | 8.4 | MT | 1,463.17 | ₹12,290.63 |
| 10 | Carriage of Sand from source to site of work Av. 150 Km by Mechanical Transport and 4000 Mtr by Manual Means. | 17.52 | Cum | 5,497.32 | ₹96,313.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1018635.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid