Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L1 | Accepted-Finance LOWEST BIDDER | |
| 2 | L2₹6.5 L+₹1,596.54 (0.25%)Rejected-Finance KOLKATA 700073 | KOLKATA | WEST BENGAL | 700073 | L2 | Rejected-Finance GREATER THAN L1 | |
| 3 | L3₹6.5 L+₹3,158.86 (0.49%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance GREATER THAN L1 | |
| 4 | L4₹6.5 L+₹4,755.40 (0.74%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L4 | Rejected-Finance GREATER THAN L1 |
Tender Value
₹10.6 L
EMD Value
₹21,853
Closing Date
25 Sept 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER ,NORTHERN MECHANICAL DIVISION ,
OFFICE OF THE EXECUTIVE ENGINEER ,NORTHERN MECHANICAL DIVISION ,PHE Dte.SILIGURI SUKANTA SARANI, PARESH NAGAR, SILIGURI, PIN 734001
Withdrawing, repairing and replacement of strainer of VT Pump No 1,2,3 and 4 along with reinstallation of the same at Fulbari Intake Pumping Station under Siliguri Comprehensive Water Supply Scheme.
2023_PHED_562371_1
WBPHED/EE/NMD/NIeT- 08 OF 2023-2024
Open Tender
MECHANICAL
Item Rate
20 days
Fulbari Intake Pumping Station under Siliguri Comp
Please refer Tender documents.
4 documents required · 4 mandatory
₹21,853
Yes
11 Oct 2023
1 Sept 2023
27 Sept 2023
4 Sept 2023
25 Sept 2023
4 Sept 2023
Amount
Supply & delivery of following items:-
Basket Strainer. MOC GI
Gasket Champion universal high temperature/pressure sheet of 0.5mm size metallic type. ( 3 mtr. X 3 mtr.)
Pacseal Teflon type graphite Aramid Gland Packing 12 mm.
Servo Prime Mobile 20w 40.
2 inch Ball Valve.
Withdrawing of existing age old vertical turbine Pump of model no. E24TC of WPIL make from the sump well after dismantling from thrust bearing assembly and decoupling of 75KW vertically Mounted induction Motor with all allied power cables and complete column pipe and shaft assembly part by part as per direction of EIC.
Dismantling of Bowl assembly part by part for taking out the packed garbage with waste materials and reassembling of the same part by part as per instruction of EIC. (For pump no. 3 &4).
Installation of Vertical Turbine Pump with the existing column pipe and shaft assembly with necessary alignment with thrust bearing and existing electrically driven prime mover for achieving minimum eccentricity and subsequent list vibration for achieving highest level of performance of the entire assembly as per direction and entire satisfaction of EIC.
Add GST @18%
GHOSE ENGINEERING SYNDICATE
ORIENTAL ENGINEERING CO.
WEST BENGAL ENGINEERING CO.
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .