| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-Finance | ₹31.1 L | L1 | Accepted-Finance Low Bid |
| 2 | L2₹31.8 LRejected-Finance | ₹31.8 L | L2 | Rejected-Finance High Bid |
| 3 | L3₹31.9 LRejected-Finance | ₹31.9 L | L3 | Rejected-Finance High Bid |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
1 Apr 2026, 2:00 pmClosed
EXECUTIVE OFFICER
NAGAR PANCHAYAT FARIDNAGAR
Estimate for repair and restoration works in DUDA Flats, including rectification of the existing water supply system and rehabilitation of the Overhead Tank ( OHT).
2026_DOLBU_1130596_1
387/NPF/E-Tender/2026
Open Tender
Civil Works
90 days
NAGAR PANCHAYAT FARIDNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,718
EXECUTIVE OFFICER
₹3.1 L
23 Apr 2026
26 Mar 2026
1 Apr 2026
26 Mar 2026
1 Apr 2026
26 Mar 2026
26 Mar 2026 - 1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundation in ordinary soil (loam,clay or sand) including lift upto 1.50 m & lead upto 30m, and including refilling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal od surplus earth as directeded by the engineer-in-charge upto a distance of 30m from the foundation trenches(where machine can not reach/move). | |||||
| 2Providing and laying in cement concrete 1:6:12 (1 cement :6 fine sand :12 graded brick ballast) and curing complete,including cost of form- work,in foundation and floors. | |||||
| 3Class M-150 brick work in 1:4 cement coarse sand (of 2.20 fineness modulus) mortar in foundation & plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work. | |||||
| 412 mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | |||||
| 5Cement Concrete with 2 cm. gauge stone ballast, coarse sand and cement. In proportion of 1:2:4 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | |||||
| 6M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape as necessary inclding bending for proper complition of the work and including supply of all steel & wastage, bend, hooks and authorised overlapping hall be measured. | |||||
| 7R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. | |||||
| 8Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of REPAIRS TO BUILDING 1140 Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | |||||
| 9Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | |||||
| 10Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_2109232.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid