| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 LAccepted-AOC | ₹1.6 L Quoted ₹3.7 L | L-1 | Accepted-AOC Being Lowest -1 |
| 2 | L-2₹3.8 L+₹15,331.80 (4.19%)Rejected-AOC | ₹3.8 L+₹15,331.80 (4.19%) | L-2 | Rejected-AOC Being Lowest-2 |
| 3 | L-3₹4.2 L+₹50,839.80 (13.9%)Rejected-AOC HIMACHAL PRADESH HP | ₹4.2 L+₹50,839.80 (13.9%) | L-3 | Rejected-AOC Being L-3 |
| Sl No | Description | Qty | Unit | m/sbalagi contector L1 | rohit kumar L3 | RAMA SHANKER L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and laying cement concrete work 1:4:8(1cement:4 sand:8 graded stone aggregate 40 mm nominal size) and cuting complete in foundation & plinth.) | 18.09 | P/cum | 6,000 ₹1,08,540 Lowest | 7,500 ₹1,35,675 | 6,200 ₹1,12,158 |
| 2.00 | Cement concrete flooring 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size) laid in one layer finished with a floating coat of neat cement (40mm thick) in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 25.84 | P/sqmt | 8,200 ₹2,11,888 Lowest | 8,800 ₹2,27,392 | 8,500 ₹2,19,640 |
| 3.00 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centering, shuttering , strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4meters and removal of the same for insitu reinforced concrete and plain concrete work in Vertical Surface etc. | 9.24 | P/sqmt | 380 ₹3,511.2 Lowest | 450 ₹4,158 | 400 ₹3,696 |
| 4.00 | Providing tor steel reinforcement for RCC work i/c bending,binding & placing in position complete in all respect with in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 155.94 | P/Kg | 110 ₹17,153.4 Lowest | 130 ₹20,272.2 | 120 ₹18,712.8 |
| 5.00 | Steel work welded in built up sections, trusses and framed work, including cutting, hoisting fixing in position and applying a priming coat of red lead paint. In beams joists channels, angles, tee, flats with connection plates or angle cleets as in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 221.76 | P/Kg | 110 ₹24,393.6 Lowest | 130 ₹28,828.8 | 120 ₹26,611.2 |
Tender Value
₹1.9 L
EMD Value
₹3,730
Closing Date
22 Jun 2026, 11:00 amClosed
Executive Engineer
EE JSV Division Barsar
Repair of motor foundation in Pump House 1st Panjarar
2026_HPIPH_136458_1
NIT No. 2657-756 dated 11.06.2026
Open Tender
Civil Works
Item Rate
30 days
Sub Division Bhota
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
EE Barsar
₹3,730
30 Jul 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying cement concrete work 1:4:8(1cement:4 sand:8 graded stone aggregate 40 mm nominal size) and cuting complete in foundation & plinth.) | 18.09 | P/cum | 1.25 | ₹22.61 |
| 2 | Cement concrete flooring 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size) laid in one layer finished with a floating coat of neat cement (40mm thick) in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 25.84 | P/sqmt | 1.25 | ₹32.3 |
| 3 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centering, shuttering , strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4meters and removal of the same for insitu reinforced concrete and plain concrete work in Vertical Surface etc. | 9.24 | P/sqmt | 1.25 | ₹11.55 |
| 4 | Providing tor steel reinforcement for RCC work i/c bending,binding & placing in position complete in all respect with in all leads & lifts & to the entire satisfaction of Engineer-in-Charge. | 155.94 | P/Kg | 1.25 | ₹194.93 |
| 5 | Steel work welded in built up sections, trusses and framed work, including cutting, hoisting fixing in position and applying a priming coat of red lead paint. In beams joists channels, angles, tee, flats with connection plates or angle cleets as in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 221.76 | P/Kg | 1.25 | ₹277.2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
form8.pdf
Tender Documents • 1.20 MB
BOQ_201964.xls
BOQ • 0.34 MB
form6.pdf
Tender Documents • 0.45 MB
termcondtion1.pdf
Additional Documents • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .