Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.3 LAccepted-Finance VILLAGE SILLU P O TEHSIL THEOG DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | 1 | Accepted-Finance Accepted | |
| 2 | 2₹15.4 L+₹11,430 (0.75%)Accepted-Finance R O VILLAGE SAYANH P O LOHARA TEHSIL BATH DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | 2 | Accepted-Finance Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Devender Singh L2 | SURESH SHARMA L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50m stacking the excavated soil not more than 3m clear form the edge of the excavation and then returning the stacking soil in 15cm layers, when required in to plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20m | 49.92 | Cum | 12,979.2 ₹12,979.2 Lowest | 18,470.4 ₹18,470.4 |
| 2.00 | Stone soling properly hand packed filling and consolidation with proper road roller to the required grade and camber i/c spreading watering and rolling of binding material murum & earth etc. B above 100 mm thick | 8.1 | Cum | 8,910 ₹8,910 | 6,480 ₹6,480 Lowest |
| 3.00 | Providing and laying cement 1:6:12 ( 1 Cement 6 Sand 12 graded stone aggregate 40mm nominal size) and curring complete excluding cost of centring and shuttering in | 10.77 | Cum | 33,387 ₹33,387 Lowest | 43,080 ₹43,080 |
| 4.00 | Random rubble masonry/polygonal rubble masonary /polygonal rubble masonary (uncoursed/brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement 6 sand 12 graded stone aggregate 20mm nominal size) at plinth level in | 40.77 | Cum | 1,54,926 ₹1,54,926 Lowest | 2,24,235 ₹2,24,235 |
| 5.00 | Providing form work of ordinary timber planking so as to give a rough finish including centring, shuttering strutting and propping etc. height of propping and centring below supporting floor to ceiling not exceeding 4m and removal of the same for insitu reinforced concrete and plain concrete work in | 40.39 | Sqm | 8,481.9 ₹8,481.9 Lowest | 12,117 ₹12,117 |
| 6.00 | P/L in R.C.C. work 1:2:4 ( 1 cement 2 sand 4 stone balast 20mm nominal size i/c curring complete excluding cost of form work & reinforcement upto floor two level | 4.27 | Cum | 49,959 ₹49,959 | 24,766 ₹24,766 Lowest |
| 7.00 | Mild steel / tor steels rein-forcment for r.c.c. work i/c bending and binding placing and position complete upto floor two level | 779.81 | Kg | 53,027.08 ₹53,027.08 Lowest | 62,384.8 ₹62,384.8 |
| 8.00 | Brick masonry in cement mortar 1:6 in structure upto 3mtrs. Height from plinth level i/c curing complete | 25.08 | Cum | 1,75,560 ₹1,75,560 | 70,224 ₹70,224 Lowest |
| 9.00 | Half Brick Masonary in 1:4 (1 cement 4 sand ) cement mortar upto floor two level i/c curing complete | 11.4 | Sqm | 36,480 ₹36,480 | 31,920 ₹31,920 Lowest |
| 10.00 | Steel work welded in built up section trusses & framed work i/c cutting hoisting fixing in position and applying a priming court of red lead in beams joists channela angles tee flat with connecting plates oe angle cleats as in main and cross beams hip & jack rafter purlins connecting to common rafter | 1,473 | Kg | 1,06,056 ₹1,06,056 Lowest | 1,39,935 ₹1,39,935 |
Tender Value
₹20.1 L
EMD Value
₹41,000
Closing Date
6 Mar 2026, 11:00 amClosed
DCF Chopal
Office of Divisional Forest Officer Chopal
Construction of Forest Guard Hut, At Kanda Beat, Block Forest Kanda, Kanda Range under Chopal Forest Division
2026_FD_129889_1
1/2025-26/kanda
Open Tender
Civil Works - Buildings
Item Wise
Chopal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
DCF Chopal
₹41,000
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50m stacking the excavated soil not more than 3m clear form the edge of the excavation and then returning the stacking soil in 15cm layers, when required in to plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20m | 49.92 | Cum | 411 | ₹20,517.12 |
| 2 | Stone soling properly hand packed filling and consolidation with proper road roller to the required grade and camber i/c spreading watering and rolling of binding material murum & earth etc. B above 100 mm thick | 8.1 | Cum | 969.8 | ₹7,855.38 |
| 3 | Providing and laying cement 1:6:12 ( 1 Cement 6 Sand 12 graded stone aggregate 40mm nominal size) and curring complete excluding cost of centring and shuttering in | 10.77 | Cum | 4,685.75 | ₹50,465.53 |
| 4 | Random rubble masonry/polygonal rubble masonary /polygonal rubble masonary (uncoursed/brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement 6 sand 12 graded stone aggregate 20mm nominal size) at plinth level in | 40.77 | Cum | 5,250 | ₹2,14,042.5 |
| 5 | Providing form work of ordinary timber planking so as to give a rough finish including centring, shuttering strutting and propping etc. height of propping and centring below supporting floor to ceiling not exceeding 4m and removal of the same for insitu reinforced concrete and plain concrete work in | 40.39 | Sqm | 411.15 | ₹16,606.35 |
| 6 | P/L in R.C.C. work 1:2:4 ( 1 cement 2 sand 4 stone balast 20mm nominal size i/c curring complete excluding cost of form work & reinforcement upto floor two level | 4.27 | Cum | 6,500 | ₹27,755 |
| 7 | Mild steel / tor steels rein-forcment for r.c.c. work i/c bending and binding placing and position complete upto floor two level | 779.81 | Kg | 102 | ₹79,540.62 |
| 8 | Brick masonry in cement mortar 1:6 in structure upto 3mtrs. Height from plinth level i/c curing complete | 25.08 | Cum | 8,200 | ₹2,05,656 |
| 9 | Half Brick Masonary in 1:4 (1 cement 4 sand ) cement mortar upto floor two level i/c curing complete | 11.4 | Sqm | 1,200 | ₹13,680 |
| 10 | Steel work welded in built up section trusses & framed work i/c cutting hoisting fixing in position and applying a priming court of red lead in beams joists channela angles tee flat with connecting plates oe angle cleats as in main and cross beams hip & jack rafter purlins connecting to common rafter | 1,473 | Kg | 130 | ₹1,91,490 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_192021.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .