Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
18 Nov 2026, 3:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Officer Chetpet Town Panchayat
Executive Officer Chetpet Town Panchayat
Construction of New Anganvadi Building at Palla street centre in Chetpet Town Panchayat
2026_DTP_721311_1
1043/2026/A1
Open Tender
Civil Works - Buildings
Works
180 days
Chetpet
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,000
Chetpet Town Panchayat
3 Nov 2026
3 Nov 2026
18 Nov 2026
3 Nov 2026
18 Nov 2026
3 Nov 2026
6 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 28 | m3 | - | - |
| 2 | Plain Cement Concrete 1:5:10 (one part of cement, Five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 8 | m3 | - | - |
| 3 | Brick work in following Cement Mortar using best quality ground mould chamber burnt bricks of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally, other type of bond shall be done as directed by the Executive Engineer in charge. | 42 | m3 | - | - |
| 4 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 22 | m3 | - | - |
| 5 | Supplying and erecting centering for vertical plain / RCC concrete walls of supply channel, retaining wall etc upto 90Cm height with necessary supports,all cross bracing with mild steel size of 90cm x60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x25 mm x3mm for bearing laid silver Oak/ Country wood joist of size 7.50 cm x5.0 cm spaced @ about 90 cm C/C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C/C etc,, complete complaying with standered specfications and as directed by the departmental officers - Plinth Beam | 44 | m2 | - | - |
| 5.01 | Slab Centering | 121 | m2 | - | - |
| 6 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 1,784 | Kg | - | - |
| 7 | Weathering Course with Concrete Broken Brick (S.I.No.278) & ( P & D) Data 54. Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers etc., complete.-10 cum | 4 | m3 | - | - |
| 8 | Finishing with top of roof with one course of machine pressed tiles of size 20cm x 20cm x 20cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with same water proofing compound mixed with cement motar ,red oxide, including cost and conveyance of all materials and labour charges and other incidental charges etc., complete as per standard specification | 50 | m2 | - | - |
| 9 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 325 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 0.73 MB
BOQ_866150.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .