Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 LAdmitted-Finance | ₹1.5 L | L2 | Admitted-Finance |
| 3 | L3₹1.5 LAdmitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | ₹1.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Technocrat Electrical L1 | P&H Engineering L3 | TIRUPATI ELECTRICALS L2 |
|---|---|---|---|---|---|---|
| 1.00Following work is to be carried out at 132 KV S/S Ganga Nagar, Meerut | ||||||
| 1.01 | (i) Configuration, testing and integration of 132/33 KV Transformer Bay in existing Simens make SCADA System at 132 KV S/S Ganga Nagar, Meerut
(ii) Necessary wiring will be checked as per the protection scheme required for Simens make SCADA System.
(iii) Relay signals will be checked in MCU as per the scheme required.
(iv) Relay configuration work will be done in BCU. | 1 | No | 1,36,400 ₹1.4 L | 1,40,500 ₹1.4 L | 1,40,000 ₹1.4 L |
| 2.00 | Erection of ALP structure (06 Nos.) | 0.8 | MT | 3,580 ₹2,864 | 4,000 ₹3,200 | 4,000 ₹3,200 |
| 3.00 | Erection of 33 KV Post insulator | 3 | Nos. | 1,900 ₹5,700 | 3,000 ₹9,000 | 3,000 ₹9,000 |
Tender Value
₹1.5 L
EMD Value
₹2,000
Closing Date
16 Feb 2026, 2:00 pmClosed
EE ETD MEERUT
Executive Engineer ETD Pareshan Bhawan 130D Victoria Park Meerut
Configuration and Integration of 132 KV 33 KV Transformer Bay at 132 KV Sub Station Ganga Nagar GIS under ETD Meerut
2026_UPTCL_1112064_1
Short Term ETD/MT/T-07/2025-26
Open Tender
Electrical Works
90 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD MEERUT
₹2,000
24 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
Following work is to be carried out at 132 KV S/S Ganga Nagar, Meerut
(i) Configuration, testing and integration of 132/33 KV Transformer Bay in existing Simens make SCADA System at 132 KV S/S Ganga Nagar, Meerut (ii) Necessary wiring will be checked as per the protection scheme required for Simens make SCADA System. (iii) Relay signals will be checked in MCU as per the scheme required. (iv) Relay configuration work will be done in BCU.
Erection of ALP structure (06 Nos.)
Erection of 33 KV Post insulator
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tenderdoc07.pdf
Tender Documents • 0.93 MB
BOQ_2056355.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid