Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹34.3 L
EMD Value
₹34,300
Closing Date
12 Aug 2020, 2:00 pmClosed
SE GCC CBE
182,DR.SUBBARAYAN STREET, TATABAD, COIMBATORE DT - 641 012.
20/2020-21 of SE GCC CBE
2020_EB_173999_1
20/2020-21 of SE GCC CBE
Open Tender
Civil Works
Item Wise
90 days
Coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹34,300
Yes
26 Aug 2020
30 Jul 2020
12 Aug 2020
30 Jul 2020
12 Aug 2020
30 Jul 2020
Amount
Clearing the Light jungle in way leave and disposed away from the site as per direction of Engineer incharge including cost of all labour, lead, lift etc complete.
Check Survey and pit marking of various tower locations inlcuding Hire Charges for all scientific instruments / Instruments, labour, lead, lift etc complete.
HGS SS.20.B. Earth work excavation for foundation and depositing on bank in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and as per standard specification
SDR - (Not Requiring Blasting) Earth work excavation for foundation and depositing on bank with Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting and as per standard specification.
Earth work Excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock not requiring blasting including all leads, lifts etc., as per standard specification complete
Earth work Excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in medium rock and dense medium rock requiring blasting including all leads, lifts etc., as per standard specification complete
Earth work Excavation and deposting on bank with initial lead of 10 metre and initial lift of 2 metre in Hard rock requiring control blasting including all leads, lifts etc., as per standard specification complete
Earth work Excavation for tower foundation in Hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts etc., as per standard specification complete.
Dewatering upto 1.05 m height of wet tower locations using disel engine including cost of all major and minor T & P "s with all lead lift etc complete.
Providing shoring and shuttering using 30 cm wide cw planks, 13 cm to 15 cm thick casurina props and nails including cost of all major and minor T & P "s with all lead lift etc complete.
Providing anchor rod / Grip rod of 20mm dia RTS (Not less than Fe 500 Grade) to a length of 2m by drilling 32mm dia hole to a depth of 1.00 metre into hard rock and grouting with Bonding materials as directed by the TANTRANSCO Engineer at site including cost of all materials, labour, lead, lift , curing , etc., complete.
PCC 1:3:6 using 40mm HB metal for tower foundation concrete with out form work including cost of all materials, labour,curing lead, lift, curing etc., complete.
Reinforced cement concrete in C.C. 1:1 1/2:3 mix using 20 mm HBG machine crushed metal for tower Footing concrete without form work including cost of cement of approved brand all materials, labour, curing, all leads & lifts, vibrating charges as per Standard Specification ( But excluding cost of steel reinforcement)
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Reinforced cement concrete in C.C. 1:1 1/2:3 mix using 20 mm HBG machine crushed metal for tower chimney concrete with chimney steel form work including cost of cement of approved brand all materials, labour, curing, all leads & lifts, shuttering arrangements vibrating charges as per Standard Specification ( But excluding cost of steel reinforcement)
Providing steel reinforcement RTS rods of approved brand for all RCC works, including cost of steel rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete
Labour charges of setting of stub and cleat of (using template / modern technique) for KCR Tower (110 KV ) with correct level and alignment and hire charges of template, with all labour, lead, lift, etc., as per Standard specification complete. (stub and cleat will be supplied by TANTRANSCO @ karamadai stores)
Labour charges of setting of stub and cleat of (using template / modern technique) for HCR Tower (110 KV ) with correct level and alignment and hire charges of template, with all labour, lead, lift, etc., as per Standard specification complete. (stub and cleat will be supplied by TANTRANSCO @ karamadai stores)
Back filling with excavated earth other than sand including watering consolidation in 150mm thick layer and forming platform around tower legs with excess earth etc., complete.
Transporting of excess excavated earth away from site within a lead of 100 m including all labours, lead, lift etc., complete.
Providing pipe type earthing including necessary exca-vation for fixing 3M long of 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the earth strips with the legs of the stub including cost of pipe refilling earth, fixing charges transport lead, lift, labour,etc., complete.
Plastering the Chimney portion upto 0.45 m with CM 1:3, 12mm thick including all cost of shuttering charges lead lift curing labour materials etc complete
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
S.M.Tower Technology
ASAITHAMBI.M
JERALIN JERISH
MSS CONTRACTORS
C.PERIYASAMY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .