| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.7 LAccepted-AOC S 2 92 RUKMANI BIHAR GOL CHAURAHA KESHAV DHAM ROAD VRINDAVAN MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹90.7 L Quoted ₹90.4 L | L1 | Accepted-AOC Preparation Bond for Rs. 9066265.72 Only |
| 2 | L2₹98.2 LRejected-Finance 4 30 NH 2 SHRI RADHA PURAM ESTATE MATHURA | MATHURA | MATHURA | ₹98.2 L | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹98.9 LRejected-Finance H NO 279 VILLAGE POST OLE FARAH MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹98.9 L | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹1.0 CrRejected-Finance 7 C GOVIND NAGAR MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹1.0 Cr | L4 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹1.2 Cr
EMD Value
₹8 L
Closing Date
21 Apr 2026, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Renewal work with BC on Adeeng By pass road KM 1, 2(700) in district Mathura
2026_CEAGR_1136600_2
2119/14M-AC/2025 dated 02-04-2026
Open Tender
Civil Works
150 days
Mathura
Renewal work
2 documents required · 2 mandatory
₹2,360
₹8 L
Yes
Agr
12 Jun 2026
13 Apr 2026
21 Apr 2026
15 Apr 2026
21 Apr 2026
15 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Dense Graded Bituminous Macadam with Hot Mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 505 Complete in all respects. (including Cost of Bitumen) | - | Cum | - | - |
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with air compressor, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For Bitumenous Surface). (including Cost of Bitumen) | - | Sqm | - | - | |
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (including Cost of Bitumen) | - | Cum | - | - | |
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. (As per SOR Ch.-5 SL. No 21) | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
2T2_AdeengBy.pdf
Tender Documents • 1.81 MB
BOQ_2122438.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid