| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 1.01 | All kinds of soil | 40 | Cum | 185 ₹7,400 Lowest | 225 ₹9,000 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 40 | Cum | 215 ₹8,600 Lowest | 275 ₹11,000 |
| 3.00 | Supplying and Filling Moorum in the low level area including levelling and compacting by suitable methods as directed by the Engineer in charge. | 14.4 | Cum | 1,050 ₹15,120 Lowest | 1,250 ₹18,000 |
| 4.00Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : | |||||
| 4.01 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). | 5 | Cum | 8,900 ₹44,500 Lowest | 10,000 ₹50,000 |
| 5.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 5.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | Cum | 9,250 ₹92,500 Lowest | 10,000 ₹1,00,000 |
| 6.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 6.01 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3 | Cum | 11,050 ₹33,150 Lowest | 12,000 ₹36,000 |
Tender Value
Refer Docs
EMD Value
₹11,419
Closing Date
1 Aug 2026, 6:00 pmClosed
Executive Engineer (Civil) BSNLCD Madurai
Executive Engineer(C), Civil Division, Level IV Building, CTO Compound, Tallakulam, Madurai
Reconstruction of collapsed compound wall to prevent the entry of public sewage into the DTO Compound at Sivakasi Third call
2026_BSNL_285083_1
NIT No.10R2/BSNL/CDMA/25-26
Open Tender
Civil Works
Item Rate
60 days
MADURAI
Please refer tender document
3 documents required · 3 mandatory
₹590
AO (Cash) O/o PGM, BSNL Madurai
₹11,419
4 Aug 2026
22 Jul 2026
4 Aug 2026
22 Jul 2026
1 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 1.01 | All kinds of soil | 40 | Cum | 177.5 | ₹7,100 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 40 | Cum | 196 | ₹7,840 |
| 3 | Supplying and Filling Moorum in the low level area including levelling and compacting by suitable methods as directed by the Engineer in charge. | 14.4 | Cum | 970 | ₹13,968 |
| 4Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : | |||||
| 4.01 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). | 5 | Cum | 8,519.2 | ₹42,596 |
| 5Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 5.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10 | Cum | 9,045.75 | ₹90,457.5 |
| 6Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 6.01 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3 | Cum | 10,852.95 | ₹32,558.85 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 0.06 MB
BOQ_332768.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].